Bogor Regent and Army Chief of Staff Sign Agreement to Convert Waste into Fuel
Bogor Regent Rudy Susmanto and Army Chief of Staff General TNI Maruli Simanjuntak signed a cooperation agreement on processing waste into fuel oil at the Army Headquarters in Jakarta on Friday.
Rudy, in a statement received in Bogor, West Java, said the cooperation is a follow-up to the development of technology-based waste management in Bogor Regency, in addition to the Waste-to-Energy Plant project being prepared at the Galuga Final Processing Site.
“Today we signed a joint agreement on processing waste into fuel oil with the Army Chief of Staff. This is a follow-up step besides pyrolysis, the second is processing waste into electrical energy,” said Rudy.
He explained that waste at the Galuga landfill will be processed through two schemes. Waste-to-energy technology will produce electricity channelled to the Karacak substation, while pyrolysis technology will be used to convert waste into fuel oil.
According to Rudy, the implementation of both technologies is expected to reduce waste accumulation while producing alternative energy that benefits the community.
“From West Bogor for Indonesia,” he said.
The Bogor Regency Government previously prepared the construction of a Waste-to-Energy Plant facility at the Galuga landfill as a long-term solution for waste handling in Greater Bogor. The facility is designed to process waste into electrical energy while reducing the volume of waste dumped at the landfill.
The Galuga landfill is a regional final waste processing site serving Bogor Regency and Bogor City.
Source: jawawa.id (https://jawawa.id/newsitem/bogor-regent-and-army-chief-of-staff-sign-agreement-to-convert-waste-into-fuel-1786107225)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5684651/bupati-bogor-ksad-tanda-tangani-pengolahan-sampah-jadi-bbm), translated from Indonesian