Bogor City Government Begins Construction of Ciawi Selatan Off-Ramp to Reduce Congestion
With the Ciawi Selatan off-ramp in place, vehicles will be able to enter and exit the toll road directly.
Bogor City, West Java (ANTARA) — The Bogor municipal government has begun constructing the Ciawi Selatan off-ramp as a solution to reduce congestion at the Ciawi junction while improving connectivity between areas.
Bogor Mayor Dedie A Rachim said in Bogor on Friday that the off-ramp would allow vehicles coming from Jakarta or Bogor to exit directly via the Ciawi Selatan toll access without having to pass through the Ciawi Market junction.
“With this Ciawi Selatan off-ramp, vehicles can enter and exit the toll road. Until now, residents of South Bogor District returning from Jakarta or Bogor via the toll road could only exit at the Ciawi Toll Gate and continue their journey through the Ciawi Market junction,” Dedie said.
According to him, the new access is a solution to the accessibility and connectivity problems long faced by South Bogor residents, particularly those in the Rancamaya, Bojongkerta, Genteng, Cipaku and Harjasari urban villages.
Construction of the off-ramp at Km 48A of the Bogor-Ciawi-Sukabumi toll road is the result of cooperation between the Bogor municipal government, PT Trans Jabar Tol, the Ministry of Public Works, PT Sarana Multi Infrastruktur (Persero), PT Waskita Karya (Persero) and Sinar Mas Land.
Adityawarman Adil, Speaker of the Bogor City Regional House of Representatives, commended the infrastructure scheme as it was carried out through collaboration with various parties without burdening the regional revenue and expenditure budget (APBD).
“We in the Bogor City Council certainly appreciate the step taken by the Mayor as a breakthrough — creative financing in carrying out development without burdening the APBD,” he said.
Juniarti Estiningsih, Head of the Bogor City Public Works and Spatial Planning Agency, said the construction of the Ciawi Selatan off-ramp had gone through comprehensive planning stages.
These stages included a feasibility study and preliminary design, traffic analysis, land acquisition needs assessment, social and environmental studies, and spatial planning conformity reviews.
She said the project had also secured several approvals, including the principal permit for opening the exit access to the Ciawi-Sukabumi toll road at Km 48A from the Directorate General of Highways, technical approval of the traffic impact analysis from the Directorate General of Land Transport, and approval of the Final Technical Plan (RTA).
“The construction of the Ciawi Selatan toll exit off-ramp is one of the Bogor City Government’s strategic projects to support improved regional connectivity and reduce the congestion that has long occurred in the Ciawi junction area,” Juniarti said.
She explained that the Ciawi junction is one of the main transport nodes connecting Bogor City, Bogor Regency, Sukabumi and the greater Jabodetabek region.
The Bogor municipal government hopes the off-ramp construction can proceed on schedule and improve accessibility in the area, reduce congestion, and drive economic growth in Bogor City and its surroundings.
Source: jawawa.id (https://jawawa.id/newsitem/bogor-city-government-begins-construction-of-ciawi-selatan-off-ramp-to-reduce-congestion-1783698865)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5644784/pemkot-bogor-mulai-bangun-off-ramp-ciawi-selatan-kurangi-kemacetan), translated from Indonesian