Indonesian Political, Business & Finance News

BNPP pushes for increased pioneer shipping routes for Temajuk–Serasan–Natuna

| Source: Antara (Indonesian) Translated from Indonesian | Infrastructure
BNPP pushes for increased pioneer shipping routes for Temajuk–Serasan–Natuna
Image: Antara (Indonesian)

Jakarta (ANTARA) - The National Border Management Agency of the Republic of Indonesia (BNPP RI) is pushing for an evaluation of routes and an increase in the frequency of pioneer shipping services for the Temajuk–Serasan–Natuna route to strengthen connectivity in border regions.

Nurdin, the Deputy for National Border Management of BNPP RI, stated in Jakarta on Friday that the development of border connectivity must be carried out through a multi-modal system that integrates land, sea, and air transport.

“Border connectivity needs to be viewed as a multi-modal system across regions, not just the separate construction of roads or ports,” said Nuldin.

This was discussed in a coordination forum involving the Ministry of Transportation, the Regent of Sambas, Satono, the Riau Islands Provincial Government, and members of the Riau Islands Provincial DPRD at the BNPP RI Permanent Secretariat in Jakarta on Wednesday (30/9).

According to Nurdin, transit nodes in West Kalimantan—namely Badau, Entikong, Aruk, Jagoi Babang, and Temajuk—need to be positioned as part of a single corridor connected to transport hubs in West Kalimantan, extending to Serasan and Natuna.

Under this scheme, Border Posts (PLBN) and Border Posts (PLB) are expected to not only perform cross-border service functions but also support the development of economic growth centres in border areas.

Nurdin stated that strengthening domestic connectivity is a priority before international connectivity is further developed.

“What we can do now is focus on the domestic side. How we build our domestic connections, advancing Serasan, Natuna, Anambas, and so on,” he said.

The coordination forum resulted in 11 proposals, including interventions in sea and air transport routes to strengthen both domestic and international connectivity.

One area of focus is the Temajuk–Serasan–Natuna route. BNPP RI is encouraging an evaluation of routes and an increase in the frequency of pioneer shipping, integrating this with schemes for accelerated development and economic expansion in the region.

Budi Setyono, Head of the Planning and Cooperation Bureau of BNPP RI, said the Sambas Regency Government has prepared policies to facilitate the movement of people and goods so that connectivity can provide economic value to the region.

“From the Sambas Regency side, there is already a policy to prepare special packages to smooth the movement of people and goods to ensure economic value is created,” said Biddie.

Meanwhile, from the Riau Islands, aspirations emerged to overcome the isolation of island regions, particularly during certain periods when transport access faces obstacles.

Nurdin noted that the development of connectivity must be accompanied by improvements in the management of Border Posts (PLBN) that function as ports.

He stated that management is being gradually directed towards an international port approach, involving Customs, Immigration, Quarantine, and Security (CIQS) elements.

“The approach for PLBN is port-to-port, international port. We are gradually building the management model to become an international port,” said Nurdin.

Doli Boniara, Head of the Riau Islands BPPD, said the development of Serasan does not have to rely entirely on connectivity with Malaysia, as the area also has the potential to be developed as a stopover point for cruise ships.

However, developing Serasan as an international entry and exit point still faces several challenges, including sub-optimal cross-border supervision functions, customs area status, as well as port regulations and legality.

Riau Islands Provincial DPRD member Mustamin Bakri stated that the construction of Border Posts (PLBN) must be followed by the realisation of inter-regional connectivity, given that the geographical characteristics of the Riau Islands make sea and air transport essential needs.

“The main focus after the construction of PLBN is to ensure that inter-regional connectivity can be realised,” said Mustamin.

More from 2 October 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/bnpp-pushes-for-increased-pioneer-shipping-routes-for-temajuk-serasan-natuna-1790917265)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5768044/bnpp-dorong-tambah-pelayaran-perintis-temajuk-serasan-natuna), translated from Indonesian
Print