BKPM Pushes for Integration of Toll Roads and Tanjung Carat Port, with Investment Value Reaching Rp26 Trillion
The Ministry of Investment and Downstreaming/Investment Coordinating Board (BKPM) is pushing for strengthened logistics infrastructure in South Sumatra through plans to integrate a toll road network that will connect directly to Tanjung Carat Port (the new Palembang Port).
Deputy Minister of Investment and Downstreaming/Deputy Head of BKPM, Todotua Pasaribu, stated that this project is part of cross-SOE collaboration, marked by the signing of a memorandum of understanding (MoU) in Jakarta on Wednesday (12/5/2026).
“So today we are signing for cooperation on the plan for toll connectivity integration. This is also in the framework of supporting and following up on the development plan for Tanjung Carat Port,” said Todotua.
He explained that the integration of the toll road with the port is expected to accelerate the flow of goods distribution while reducing logistics costs in South Sumatra. The impact is also projected to extend to surrounding areas, including Jambi, which will be connected to the logistics network.
According to him, strengthening this connectivity will directly impact the improvement of regional logistics system efficiency and enhance inter-regional linkages in Sumatra.
Todotua mentioned that the project has two main targets: increasing the distribution capacity of commodities for domestic needs and exports, as well as improving supply chain efficiency through reduced logistics costs.
The toll road section leading to Tanjung Carat Port will connect to the Trans-Sumatra Toll Road backbone, which currently reaches South Sumatra and is targeted to connect to Jambi by the end of the year.
“There will be another interline toll leading to Tanjung Carat, approximately 80 kilometres of toll road,” he said.
In addition, the government is preparing further development of the Palembang-Prabumulih to Muara Enim section, spanning 37 kilometres, to strengthen access to natural resource production areas.
The investment value of this toll road and port integration project is estimated to reach around Rp26 trillion. According to BKPM, the project will provide a significant economic multiplier effect, especially for flagship commodities such as coal, palm oil, rubber, and coffee.
He gave the example that PT Bukit Asam currently faces limitations in increasing distribution volume due to suboptimal infrastructure. With the new connectivity, shipping capacity is projected to increase, and logistics costs can be reduced.
“With this toll road, first, the volume will rise, both for coal, coffee, rubber, palm oil, and others. This will certainly boost economic growth in the area,” said Todotua.
BKPM targets the construction of the toll road and port project to begin this year, in line with land readiness and financing support from various parties.
Source: jawawa.id (https://jawawa.id/newsitem/bkpm-pushes-for-integration-of-toll-roads-and-tanjung-carat-port-with-investment-value-reaching-rp26-trillion-1778687599)
Originally published by wartaekonomi.co.id (https://wartaekonomi.co.id/read611561/bkpm-dorong-integrasi-tol-dan-pelabuhan-tanjung-carat-nilai-investasi-capai-rp26-triliun), translated from Indonesian