Indonesian Political, Business & Finance News

Bekasi Mayor Accelerates Bulak Kapal Flyover Construction Following Fatal Accident in East Bekasi

| Source: VIVA.co.id Translated from Indonesian | Infrastructure
Bekasi Mayor Accelerates Bulak Kapal Flyover Construction Following Fatal Accident in East Bekasi
Image: VIVA.co.id

Jakarta, VIVA – Bekasi Mayor Tri Adhianto stated that the Bekasi City Government will accelerate the construction process of the Bulak Kapal flyover in East Bekasi.

The plan to build the flyover comes after a fatal train accident involving a collision between the Argo Bromo Anggrek train and a commuter line train at Bekasi Timur Station on the night of Monday, 27 April 2026.

Tri conveyed this after meeting with Deputy Speaker of the Indonesian House of Representatives Sufmi Dasco Ahmad while inspecting the accident at Bekasi Timur Station.

“So, I think the progressive step was already taken by Mr Dasco earlier. This morning, I was asked to prepare a letter to initiate the acceleration process for building the flyover at Bulak Kapal, even though it has already been initiated by the Governor,” said Tri on Tuesday, 28 April 2026.

The construction of the Bulak Kapal flyover is considered important because the level crossing in that area is prone to accidents. Additionally, it often causes long traffic jams when trains pass through.

Tri explained that the budget required for the flyover construction is around Rp250 billion.

“For the total construction, the requirement is approximately Rp250 billion. The province has provided around Rp30 billion so far,” he revealed.

According to Tri, Dasco will assist in funding the flyover construction using Presidential Assistance (Banpres) funds amounting to Rp220 billion.

“So, hopefully, the Rp220 billion will come from Mr Dasco’s efforts at the central level through the Presidential Assistance,” concluded the Bekasi Mayor.

Previously reported, train services in the East Bekasi area, West Java, were disrupted following an incident on the platform at Bekasi Timur Station on Monday night, 27 April 2026. PT Kereta Api Indonesia (KAI) confirmed that the evacuation process is still ongoing.

The incident occurred around 20:52 WIB at KM 28+920. It involved train set PLB 5568A (CL KPB–CKR) which was hit by PLB 4B or the Argo Bromo Anggrek train on the Gambir–Surabaya Pasar Turi route.

As a result, train operations on that line were affected and experienced disruptions.

Manager of Public Relations for KAI Daop 1 Jakarta, Franoto Wibowo, expressed apologies to passengers for the inconvenience caused.

Tags: berita

More from 28 April 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/bekasi-mayor-accelerates-bulak-kapal-flyover-construction-following-fatal-accident-in-east-bekasi-1777351914)
Originally published by VIVA.co.id (https://www.viva.co.id/berita/nasional/1895062-walkot-bekasi-kebut-pembangunan-flyover-bulak-kapal-buntut-kecelakaan-di-bekasi-timur), translated from Indonesian
Print