Bekasi City to Transform Bantar Gebang into New City via Waste-to-Energy Project
Jakarta, CNBC Indonesia – Bekasi Mayor Tri Adhianto Tjahyono has assured the Bekasi City Government’s support for national strategic projects (PSN), including the Waste-to-Energy (WtE) plant, also known as a waste-fired power plant (PLTSa), in Bantar Gebang.
Regarding investment in the WtE facility, the Bekasi City Government is obliged to prepare the land, ensure the availability of waste as feedstock for the plant, and manage the waste transportation process.
The Bekasi City Government has already conveyed its preparations to the Coordinating Ministry for Food Affairs for the construction of the plant, which is supported by investment from Danantara, Wangmeng Environment Co. Ltd, and Zhejiang Weiming Environment Protection Co., Ltd as operating partners for the Waste to Energy project in Bekasi.
It is hoped that waste processing in Bantar Gebang will drive the development of the area into a new sustainable satellite city for future generations. The plant, targeted for groundbreaking in August 2026, is expected to begin operations in 2028.
Beyond the WtE plant, the Bekasi City Government is continuing to push urban development, including the Patriot Chandrabhaga Stadium, which will be built in the city centre and equipped with transport facilities so it can become a national-class sports hub that drives the economy.
To find out more about the direction of Bekasi’s development, watch Bunga Cinka’s interview with Bekasi Mayor Tri Adhianto Tjahyono on Nation Hub, CNBC Indonesia (Wednesday, 15/07/2026).
Source: jawawa.id (https://jawawa.id/newsitem/bekasi-city-to-transform-bantar-gebang-into-new-city-via-waste-to-energy-project-1784515866)
Originally published by CNBC Indonesia (https://www.cnbcindonesia.com/news/20260715135429-8-751020/video-kota-bekasi-ubah-wajah-bantar-gebang-jadi-kota-baru-lewat-psel), translated from Indonesian