Basuki Insinuates ‘Commission’ in Procurements to Blame for Lack of Flood Readiness
The Jakarta Globe
By Deti Mega Purnamasari
photo: A general view showing flood water on a main road in Jakarta on January 17, 2013. (EPA)
Jakarta. Acting Jakarta Governor Basuki Tjahaja Purnama said on Friday that the ability of Southeast Asia’s largest city to prepare for the upcoming rainy season had been hamstrung by slower-than-expected adoption of the transparent e-catalog system for public procurements, which he has long championed.
“Right — the preparation has not met the target as there are still many open tenders for sheet piling,” Basuki said at City Hall on Friday. “We cannot proceed with excavation in the rivers if the sheet piling hasn’t been done.”
Sheet piling is an excavation technique that retains soil and resists lateral pressure from earth using sheets made of timber, steel or concrete.
Basuki said the Jakarta Public Works agency had insisted on procuring services through the existing scheme rather than through the new online list of service providers. He even insinuated that corruption may have had a role in the agency’s purported reluctance to depart from the system, which the acting governor has repeatedly said is vulnerable to graft.
“They always want to conduct [tenders through the existing framework],” Basuki said. “Maybe because there will be commission if they do — that’s what makes it difficult.”
In addition to big-picture problems over the general job of sheet piling vulnerable areas of the city such as the Ciliwung River, the Public Works agency had not procured the necessary number of cranes to do the heavy lifting — a specific failing that meant the city would not be as far along on in its flood-prevention strategy as Basuki would have liked.
“For now, let’s just face [the rainy season] with what we have,” he said.
Source: jawawa.id (https://jawawa.id/newsitem/basuki-insinuates-commission-in-procurements-to-blame-for-lack-of-flood-readiness-1414083600)
Originally published by The Jakarta Globe (http://thejakartaglobe.beritasatu.com/news/jakarta/basuki-insinuates-commission-procurements-blame-lack-flood-readiness/)