Bappenas and PLN Collaborate to Develop 100 GWp Solar Power Plants
Jakarta (ANTARA) - The Ministry of National Development Planning/National Development Planning Agency (PPN/Bappenas) is collaborating with PT PLN (Persero) to develop solar power plants (PLTS) with a capacity of 100 GWp (gigawatt peak) equipped with battery energy storage systems (BESS).
This collaboration is intended to strengthen the domestic ecosystem and supply chain as a foundation for energy independence and resilience.
“Energy development must be able to support the ecosystem and the supply chain. If the supply chain is disrupted, there is no independence. If there is no independence, there is no security,” said the Minister of PPN/Head of Bappenas, Rachmat Pambudy, during a meeting with the President Director of PLN, Darmawan Prasodjo, as quoted from an official statement in Jakarta on Wednesday.
The Head of Bappenas emphasised that energy development needs to ensure supply capability, affordability, and sustainability. “Supply capability, affordability, and sustainability are our requirements for PLN,” he stated.
Furthermore, Rachmat expressed his appreciation for PLN’s performance and directed that all of PLN’s contributions and milestones be documented as part of the national energy independence footprint. He also encouraged the preparation of an energy development roadmap in conjunction with PLN and the Ministry of PPN/Bappenas.
Meanwhile, Darmawan noted that licensing and permitting remain among the challenges in programme implementation, and expressed PLN’s readiness to carry out Minister Rachmat’s directives.
The Deputy for Infrastructure at the Ministry of PPN/Bappenas, Abdul Malik Sadat Idris, responded by stating readiness to support the acceleration of the programme through ecosystem strengthening, including simplifying procedures, adjusting regulations, and resolving issues regarding land certainty and various permits.
“The President Director’s programme is very executable as long as we improve the ecosystem level through debottlenecking (the process of identifying and removing obstacles to increase production capacity and efficiency) and the management of National Strategic Projects (PSN), including land certainty and water surface requirements as game changers,” he said.
In addition to supporting energy security, the Ministry of PPN/Bappenas and PLN are also committed to developing domestic industries and supply chains to drive economic growth.
Source: jawawa.id (https://jawawa.id/newsitem/bappenas-and-pln-collaborate-to-develop-100-gwp-solar-power-plants-1791360355)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5775020/bappenas-dan-pln-kerja-sama-kembangkan-plts-berkapasitas-100-gwp), translated from Indonesian