Indonesian Political, Business & Finance News

Banten Provincial Government to Realise Village Road Repairs in Pandeglang

| Source: Antara (Indonesian) Translated from Indonesian | Infrastructure
Banten Provincial Government to Realise Village Road Repairs in Pandeglang
Image: Antara (Indonesian)

The Banten Provincial Government (Pemprov) will soon realise road infrastructure repairs in Cijaralang Village, Cimanggu District, Pandeglang Regency, as a swift response to the aspirations of the local community, who have longed for proper road access for decades.

Banten Governor Andra Soni, in Pandeglang on Wednesday, stressed that the repairs would be executed through the Bangun Jalan Desa Sejahtera (Bang Andra) Programme.

“I know this is technically a district or village road, but I do not want to look at it that way. I see that the community needs it,” he said after directly inspecting the road in Buluh Hamlet, Cijaralang Village.

He explained that the road construction would be budgeted in the 2026 Revised Regional Budget (APBD Perubahan). The Banten Provincial Government is targeting the initial phase of work, spanning 700 metres to one kilometre, to commence in October 2026, with continuation in early 2027.

Furthermore, Andra has instructed the Banten Public Works and Spatial Planning Agency (PUPR) to coordinate with the village head and community leaders to determine priority work points. Special attention will be given to a steep incline that becomes difficult to traverse during the rainy season and often hampers vehicles delivering the Free Nutritious Meal (MBG) service. Additionally, the drainage system will be reorganised so as not to be covered by the road, along with a feasibility check on three decades-old bridges in the area.

Andra stated that this infrastructure development is a manifestation of the President’s Asta Cita programme to build from the village and grow the grassroots economy. Throughout 2025, the Banten Provincial Government has built 71 kilometres of concrete village roads and 407 kilometres of neighbourhood roads.

“Banten’s population is also large, nearly 13 million. So we must be patient; we will work on it gradually,” he added.

Andra also advised residents to be patient and not to traverse the road during the concreting period. Concrete roads require at least 28 days to cure perfectly in order to have a lifespan of decades.

Meanwhile, Cijaralang Village Head Sa’i expressed gratitude and appreciation for the first-ever visit by a Governor to his village. He hopes the proposed repair of the 3,600-metre Cikadu-Cengkok road section will truly be realised.

“Our hope is that this is not just a dream. We have been waiting for a leader of the Governor’s stature to sit with us and listen to our aspirations,” he said.

More from 12 August 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/banten-provincial-government-to-realise-village-road-repairs-in-pandeglang-1786553681)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5691804/pemprov-banten-realisasikan-perbaikan-jalan-desa-di-pandeglang), translated from Indonesian
Print