Bahlil targets electricity access for every village in Maluku by 2029
Ambon (ANTARA) – Energy and Mineral Resources Minister Bahlil Lahadalia is targeting full electricity access for every village and hamlet in Maluku Province by 2029–2030, as part of efforts to ensure more equitable energy access for people in remote, frontier and outermost regions.
“I am setting a target for all villages in Maluku Province to have electricity by 2029–2030,” Bahlil said during a briefing at the opening of the Golkar Party’s regional working meeting in Ambon, Maluku, on Saturday.
Bahlil said he was concerned about the continuing gap in energy infrastructure in his home province. He cited Pulau Run in the Banda Islands, Central Maluku Regency, where residents still do not have a reliable 24-hour electricity supply.
“Why do I say this? I visited Pulau Run in Banda Neira just last year, and they still did not have electricity around the clock. Yet in the Dutch era, this island was once exchanged for Manhattan in the United States. Manhattan has since advanced rapidly, while even the electricity supply on Pulau Run remains inadequate,” Bahlil said.
Nationally, he said, around 11,000 villages and hamlets across Indonesia still lack adequate access to electricity. Accelerating electrification is therefore one of the government’s key priorities, following direct instructions from President Prabowo Subianto.
To address the disparity, the government is preparing two main programmes to be implemented in stages and on a sustained basis.
The first is the Village Electricity Programme (Lisdes), which focuses on building and extending electricity infrastructure to remote areas not served by the PLN grid. The second is the New Electricity Connection Assistance Programme (BPBL), which provides free electricity connections directly to the homes of low-income residents.
The government is increasing its annual targets for bringing electricity to villages. In 2025, the programme is focused on around 1,400 villages, with targets set to rise significantly in 2026 and 2027 through close collaboration between local governments and state electricity company PT PLN (Persero).
Bahlil said he was optimistic that cross-sector collaboration, alongside the Lisdes and BPBL programmes, would gradually eliminate unequal energy access in island regions such as Maluku by 2030.
Source: jawawa.id (https://jawawa.id/newsitem/bahlil-targets-electricity-access-for-every-village-in-maluku-by-2029-1794034326)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5838171/bahlil-targetkan-seluruh-pelosok-desa-di-maluku-teraliri-listrik-2029), translated from Indonesian