Bahlil Speeds Up Free Electricity Connections in West Java, Raising This Year’s Target to 25,000 Households
Jakarta – The government, through the Ministry of Energy and Mineral Resources (ESDM), is targeting 25,000 households in West Java to receive assistance with new electricity connections (BPBL) in 2026.
The free connection programme is aimed at low-income families that do not have their own electricity supply. Alongside distributing the assistance, the government is strengthening the network through its Village Electricity (Lisdes) programme to expand access and improve supply quality.
Energy and Mineral Resources Minister Bahlil Lahadalia inspected the implementation of both programmes in Muara Baru Village, Cilamaya Wetan district, Karawang regency, on Thursday (15 October 2026). He checked that the assistance was reaching residents and reviewed improvements to local electricity infrastructure.
West Java’s BPBL allocation for this year is higher than the 2025 figure, when 15,831 households received assistance. The target is projected to rise again to 30,000 households in 2027.
The expansion is supported by West Java’s electricity system, which has a reserve capacity of 5,184 megawatts. The available supply underpins efforts to provide connections to people who do not yet have an independent electricity service.
In Karawang regency, the 2026 BPBL target is 683 households. Electricity has been switched on in 299 homes, while installations have been completed in another 360, which are awaiting connection. Installations are still under way in the remaining 24 homes. The programme follows last year’s assistance, which reached 915 households in Karawang.
In Cilamaya Wetan district specifically, free connection assistance has been allocated to 52 households. Electricity has been switched on in seven homes, 41 are awaiting connection, and work is still under way in the other four.
BPBL helps address the upfront connection cost, which is about Rp2 million. This expense has left some low-income families relying on electricity connections from their neighbours’ homes.
Recipients receive free home electrical installations comprising three light points, one double switch, one single switch, one socket outlet and an earthing system. The assistance also covers testing and the issuance of an Operational Feasibility Certificate (SLO), a new 900-volt-ampere PLN connection, and an initial electricity token worth Rp100,000. The support gives recipients the opportunity to have their own connection.
In addition to new connections, supply quality is also a concern in Muara Baru Village. Bahlil said the area had previously been connected to the grid but continued to experience low voltage.
Source: jawawa.id (https://jawawa.id/newsitem/bahlil-speeds-up-free-electricity-connections-in-west-java-raising-this-years-target-to-25-000-households-1792140863)
Originally published by VIVA.co.id (https://www.viva.co.id/bisnis/1936336-bahlil-percepat-listrik-gratis-di-jabar-target-tahun-ini-naik-jadi-25-ribu-rumah-tangga), translated from Indonesian