Indonesian Political, Business & Finance News

Badung Regency Government Builds IDR 2.9 Trillion JLS and Shortcut to Tackle Congestion

| Source: detikcom Translated from Indonesian | Infrastructure
Badung Regency Government Builds IDR 2.9 Trillion JLS and Shortcut to Tackle Congestion
Image: detikcom

The Badung Regency Government (Pemkab Badung) has officially begun construction of two strategic mega infrastructure projects worth more than Rp 2.9 trillion. The projects comprise the Southern Ring Road (JLS) and the Berawa-Umalas-Kedampang-Teuku Umar Barat shortcut.

The move is a concrete step to tackle congestion and improve inter-regional connectivity. The construction is also expected to strengthen the competitiveness of tourism and the region’s economic growth.

The groundbreaking was carried out directly by the Regent of Badung, I Wayan Adi Arnawa, together with the Governor of Bali, Wayan Koster. The ceremony was marked by the pressing of a siren button at the JLS Segment 4 construction site in Pecatu Village, South Kuta District, on Monday (27/7).

“The development of corridors in South Kuta and North Kuta Districts is designed to form an interconnected road network. This infrastructure will provide alternative routes, reduce the traffic burden on main arteries, and improve accessibility,” said Regent of Badung I Wayan Adi Arnawa in a statement on Tuesday (28/7/2026).

The Regent explained that the initial phase of construction in 2026-2027 covers the JLS and the improvement of the Siligita Junction along 10.89 kilometres. In addition, the government is also building the Semer-Teuku Umar Barat road stretching 4.77 kilometres.

“Once this road network is completed, Badung as a whole will be traversed by large, interconnected roads. I am confident that our tourism carrying capacity will improve and public mobility will become smoother,” he asserted.

Adi Arnawa revealed that the entire process had been prepared thoroughly and with precision. The preparations included the drafting of a Feasibility Study (FS), Detail Engineering Design (DED), site determination, and land acquisition.

He acknowledged that the land acquisition process faced various dynamics in the field. However, the community ultimately gave its full support, having grown weary of the congestion plaguing the southern Badung area.

The construction of the JLS forms part of a grand plan to provide a road network stretching nearly 30 kilometres across southern Badung. For the central and northern parts of Badung, the government is also preparing a road network of 52.95 kilometres to be realised in phases up to 2029.

Meanwhile, the Governor of Bali, Wayan Koster, also expressed his appreciation for the realisation of these strategic projects. He assessed that the construction of the JLS is a concrete solution to chronic congestion whilst safeguarding the quality of Bali’s tourism industry.

Koster also judged the Badung Regency Government’s decision to utilise financing from PT Sarana Multi Infrastruktur (PT SMI) as highly apt. This strategic step was taken so that construction can be accelerated without continually being burdened by future increases in construction costs.

Also present at the inauguration were the Secretary of the Directorate General of Highways at the Ministry of Public Works and Housing, Haeruddin C. Maddi, and the board of directors of PT SMI. The event was also attended by officials of the Bali and Badung regional leadership coordination forum (Forkopimda), leaders of state-owned enterprises in the Bali region, members of the Badung Regional House of Representatives (DPRD), and local community figures.

More from 28 July 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/badung-regency-government-builds-idr-2-9-trillion-jls-and-shortcut-to-tackle-congestion-1785210817)
Originally published by detikcom (https://news.detik.com/berita/d-8593294/pemkab-badung-bangun-jls-dan-shortcut-rp-2-9-t-untuk-atasi-kemacetan), translated from Indonesian
Print