Former Youth and Sports Minister Adhyaksa Dault admitted that it was he who came up with the idea to build the sports center in Hambalang, West Java, but added that the plan did not come to fruition during his tenure.

“It’s true and it was meant as a sports training center. The Rp 125 billion [$11 million] was never disbursed because there was no land certificate,” Adhyaksa said at the Jakarta Anti-Corruption Court on Tuesday.

Adhyaksa said he was not involved in the Hambalang graft case because the project had not been realized before his term expired and that it was taken over by his successor, Andi Mallarangeng.

Ida Nuraidah, president director of civil engineering firm Biro Insinyur Exakta who testified at the Jakarta Anti-Corruption Court during Deddy Kusdinar’s trial, said that under Andi’s leadership, the Ministry pushed the project through.

“At the time it still had no name. But from what we knew, it was to be a training center for junior athletes,” Ida said.

She said that her firm was involved in the project since the beginning and that the Ministry of Youth and Sports had conducted a feasibility study and prepared a design for the building that was going to be constructed on 35 hectares of land.

Ida said the Hambalang project had been planned since 2006, but that it did not commence because the search for a viable location was ongoing.

“What we received was the feasibility study about the location and the master plan. At the time, the ministerial position was held by Adhyaksa Dault, around early 2009,” Ida said.

Biro Insinyur Exakta technical and operational director Sonny Anjangsono said the budget for the Hambalang project was revised several times.

He said the initial budget for the project was Rp 125 billion, but it later swelled to Rp 2.5 trillion.

“It was revised four times. First it was Rp 125 billion, then Rp 225 billion, later some Rp 800 billion, and the last one was Rp 2.5 trillion,” said Sonny, who also testified on Tuesday.

He said the budget revisions were conveyed by Youth and Sports Ministry secretary Wafid Muharam.

Sonny claimed Wafid asked him to draft a multi-year Rp 2.5 trillion budget plan.

But Sonny said he told the secretary that the site selected would be unsuitable, meaning it would be impossible to construct the Hambalang project as planned.

He said there were no surveyed property boundaries provided by the National Land Agency, and no environmental impact assessment (Amdal) undertaken. Sony said he also pointed out that the review of the project’s master plan was incomplete and that there were buildings on the land.

“So, the documents could not be provided for the Rp 2.5 trillion budget and based on my view it was impossible to build there,” Sonny said.

He added that he reported these condition to his superior Ida, which contributed to the company’s decision to pull out of the project.

In the indictment filed by the Corruption Eradication Commission (KPK) prosecutors against Wafid, it was revealed that the civil engineering firm withdrew from the Hambalang project after it suspected that it was tainted by graft.

Their suspicions became stronger after Wafid valued the project much higher than the company’s technical calculations.

The Jakarta Anti-Corruption Court commenced its first hearing into the Hambalang graft case last week.

More from 13 November 2013 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/architects-held-suspicion-over-hambalang-vision-court-hears-1384275600)
Originally published by The Jakarta Globe (http://www.thejakartaglobe.com/news/architects-held-suspicion-over-hambalang-vision-court-hears/)
Print