Indonesian Political, Business & Finance News

Antasari Flyover Towards Cipete Gridlocked Tonight Due to Excavation Works

| Source: detikcom Translated from Indonesian | Infrastructure
Antasari Flyover Towards Cipete Gridlocked Tonight Due to Excavation Works
Image: detikcom

Traffic on the Antasari Non-Toll Flyover (JLNT) heading towards Cipete, South Jakarta, was gridlocked tonight. The congestion is believed to have been caused by excavation works on Jalan Pangeran Antasari.

According to reports from the Metro Jaya Police Traffic Management Centre (TMC) on Tuesday (4/8/2026), the volume of vehicles from the South Jakarta Mayor’s Office towards Paradise Apartments increased at 19:00 WIB. Traffic engineering was carried out by widening the water barrier on the JLNT Antasari exit ramp to reduce density on the flyover.

In a video uploaded to the TMC Polda Metro Jaya X account, police officers were seen shifting the water barrier to widen the section of Jalan Terusan Gaharu, South Jakarta. The traffic situation appeared heavily congested and crawling.

In its report, TMC Polda Metro Jaya stated that the traffic jam occurred due to excavation works on a section of Jalan Pangeran Antasari. “Our officers have made traffic management efforts in the area in connection with the excavation works by PDAM on Jalan Antasari, which has impacted traffic flow density,” TMC Polda said on its official X account at 20:54 WIB.

More from 4 August 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/antasari-flyover-towards-cipete-gridlocked-tonight-due-to-excavation-works-1785858765)
Originally published by detikcom (https://news.detik.com/berita/d-8604578/ada-proyek-galian-jalan-layang-antasari-arah-cipete-macet-malam-ini), translated from Indonesian
Print