Indonesian Political, Business & Finance News

Annual Suffering [Tempo Commentary]

| Source: Tempo Interactive

Tempo.co

In the run-up to the Idul Fitri holidays, we are disturbed by a recurring problem that happens virtually every year on the Java North Coast Road, known as Pantura. This comprises gaping holes up to 30 centimeters across, a damaged road surface and the resulting long lines of traffic. This annual serious damage shows how short our memories can be on the suffering and losses caused to road users.

Repairs cost increased funding year by year, but the condition of the roads continues to deteriorate. In 2012, repairs to the Pantura cost Rp700 billion. This figure rose to Rp993 billion the following year, and reached Rp1.285 trillion in 2013. But this year's repairs have still not been effective like a vicious circle, even with ever higher spending.

According to Jasa Marga, the highways agency of the Public Works Ministry, which bears the most responsibility, the excessive tonnage of vehicles is the root cause. This 1,300-kilometer state highway along the north coast was designed for vehicles with a maximum weight of 10 tons. In practice, it is used by trucks weighing up to 19 tons the result of collusion between weighbridge operators and drivers of overweight trucks.

This is nothing new. The Transportation Ministry needs to end this classic problem. It could start in its own front yard by anticipating the origins of the problem seriously. The ministry often faces derision from the public over the road repairs budget. It is important that this is revised in a way that is transparent and accountable, from the planning to the implementation.

There are reasons for the repeated warnings about the accountability of this budget. An audit carried out by the Supreme Audit Agency (BPK) in 2010 found indications of inflated costs for road repairs in several areas. Understandably, the increased budget for the Pantura repairs has aroused suspicions because there has been no corresponding increase in the quality of the resulting work.

The Corruption Eradication Commission (KPK) could assist the effort by moving more quickly and responsively to investigate the reports from various elements of the public. After all, the Pantura is very important. The potential losses are not limited to actual road users: people at the end of the supply chain for goods and services also suffer.

Tasks could be divided along the lines of responsibilities. The responsible ministry could ensure that repairs to the Pantura are long-lasting not merely an 'annual project'. Meanwhile the regional governments need to take resolute action against corruption at weighbridges. Officials who take bribes and allow overweight vehicles to pass should be fired.

Without the need for complex calculations, we know that the same thing will happen when people head home for this year's Idul Fitri holidays. Therefore, without sufficient advance anticipation or a long-term strategy it is difficult if not impossible to have any realistic hope for a friendly and uncongested Pantura.

The Transportation Ministry and all its partners should choose the best options. Although it will not be easy, it is not impossible to build a good national highway that is a pleasure to drive along, rather than one with holes and a battered surface caused by the effects of corruption. (*)

More from 7 August 2013 โ†’

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/annual-suffering-tempo-commentary-1375808400)
Originally published by Tempo Interactive (http://en.tempo.co/read/news/2013/08/07/080502851/Annual-Suffering)
Print