Aceh Government Urges SBI to Optimise Cement Production for Post-Disaster Needs
The Aceh government is urging PT Solusi Bangun Indonesia (SBI), through its subsidiary PT Solusi Bangun Andalas (SBA) operating in Aceh, to optimise production to meet cement demand during the post-disaster rehabilitation and reconstruction period. Aceh Regional Secretary M Nasir stated in Banda Aceh on Friday that SBI had indicated its readiness to prioritise Aceh’s needs, only directing surplus supplies elsewhere once local requirements are fulfilled.
The public in Aceh is currently facing a cement scarcity, with prices soaring drastically to between Rp95,000 per sack for Semen Padang and Rp105,000 per sack for Semen Andalas, compared to the normal price of around Rp70,000 per sack. According to an evaluation by the Aceh government, the projected daily cement requirement in Aceh currently stands at approximately 4,200 tonnes, or 105,000 sacks, while available supply capacity is only about 3,700 tonnes, or 92,500 sacks per day, resulting in a daily deficit of around 500 tonnes, or 12,500 sacks.
Nasir explained that following a meeting with SBI’s Operations Director, the company pledged to optimise production of Semen Andalas at its Lhoknga plant in Aceh Besar Regency. The plant’s production capacity is fundamentally sufficient to meet Aceh’s needs, but it has not yet been operating at full 24-hour capacity. He said the plant had been operating 12-hour shifts and is now being pushed to run its machinery 24 hours a day due to the substantial demand.
Regarding the price increase, Nasir noted that SBI also promised to make immediate adjustments. He stressed that the issue must be resolved swiftly as it could affect development, given that the old standard prices no longer reflect the current situation. He added that contractors working on post-disaster rehabilitation and reconstruction are already struggling with the cement shortage, and government development performance will be disrupted if cement prices are not addressed.
Furthermore, the Aceh government and SBI have agreed to conduct spot checks on several cement distributors and retailers to ensure prices do not rise. Nasir emphasised that the price increase is not occurring at the production level but rather between distributors and retailers, and from retailers to the public, and that authorities are monitoring the situation to prevent hoarding.
During the meeting, SBI Operations Director Edi Sarwono confirmed that production and distribution capacity would be maximised. SBI will optimise operations at five packing terminals: Lhoknga, Krueng Raya (Malahayati), Lhokseumawe I, Lhokseumawe II, and Belawan. All terminals will implement three-shift, 24-hour operations to maximise distribution capacity. Edi stated that SBI is committed to prioritising cement supply in Aceh through increased production and distribution across all terminals, so that public needs are met and cement price stability returns to normal. The company is also conducting daily evaluations of production and distribution until supply conditions normalise. SBI confirmed additional cement shipments will be made in stages during August 2026, including optimising distribution from outside Aceh, to meet public demand and support the acceleration of post-disaster rehabilitation and reconstruction.
Source: jawawa.id (https://jawawa.id/newsitem/aceh-government-urges-sbi-to-optimise-cement-production-for-post-disaster-needs-1786107166)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5684593/pemprov-dorong-sbi-optimalkan-produksi-semen-penuhi-kebutuhan-aceh), translated from Indonesian