Indonesian Political, Business & Finance News

Aceh Government Prepares Revision of Andaman Block Gas Management Document

| Source: Antara (Indonesian) Translated from Indonesian | Energy
Aceh Government Prepares Revision of Andaman Block Gas Management Document
Image: Antara (Indonesian)

The Aceh Provincial Government is preparing a revision of the Plan of Development (PoD), or the planning document regarding the management scheme for the Tengkulo South Andaman gas field discovery (Andaman Block) by Mubadala Energy, which will subsequently be discussed with SKK Migas.

“This is the Governor’s directive. Therefore, we are immediately preparing the discussion for the revised PoD scheme for the Andaman Block,” said the Aceh Regional Secretary, M Nasir, in Banda Aceh on Monday.

Nasir stated that the discussion regarding the revised PoD scheme for the Andaman Block is a follow-up to the meeting between Governor Mualem and the Head of SKSK Migas, Djoko Siswanto, at the SKK Migas office in Jakarta last Wednesday.

During that meeting, SKK Migas provided space for the Aceh Government to propose a revision to the Andaman Block PoD and expressed willingness to accommodate such revisions.

Nasir noted that the PoD revision for the Tengkulo South Andaman gas field project will be aligned with Aceh’s development direction, in accordance with the vision and mission of Governor Mualem and his Deputy.

“Specifically, downstreaming. This downstreaming initiative is in line with the national programme. Thus, Governor Mualem’s programme is linear with President Prabowo’s programme,” he said.

The PoD revision, he continued, is being undertaken because the Aceh government desires a gas and condensate distribution scheme that goes directly to land (onshore pipelining) to be processed using the facilities at the Arun Special Economic Zone (SEZ) in Lhokseumawe.

Consequently, the management of the Andaman Block gas could create a multiplier effect on the economy by fostering industrial sectors and creating other business opportunities.

“Onshore facilities absorb a much larger number of local workers compared to floating facilities, which are highly isolated offshore,” he added.

Previously, the Governor of Aceh also sent a letter to the Minister of Energy and Mineral Resources (ESDM) regarding a request that the processing of the gas discovered by Mubadala Energy should not be conducted via a Floating Production, Storage, and Offloading (FPSO) scheme or offshore processing. Instead, it should be handled via an onshore receiving facility (ORF) at the Arun Lhokseumawe SEZ.

In the letter, the Governor of Aceh also requested that the allocation of Mubadala’s gas be utilised for industries in Aceh. Furthermore, he requested a temporary postponement of the PoD or its planning documents due to ongoing differences in opinion between the central government and Aceh.

On that occasion, M Nasir emphasised that the Governor of Aceh does not reject the Tengkulo South Andaman gas field project or Mubadala Energy as an investor, but is merely requesting that gas processing be carried out directly on the mainland of Aceh.

The Aceh Government, he continued, strongly supports a positive investment climate and has consistently encouraged capital investment in Aceh.

“Investment will drive Aceh’s economic growth and serve as a primary lever in reducing poverty and unemployment rates,” said M Nasir.

More from 22 June 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/aceh-government-prepares-revision-of-andaman-block-gas-management-document-1782132988)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5618360/pemprov-aceh-siapkan-revisi-dokumen-pengelolaan-gas-blok-andaman), translated from Indonesian
Print