Indonesian Political, Business & Finance News

A Glimmer of Hope Behind the Completion of AMMAN's Smelter in West Sumbawa

| | Source: Media Indonesia Translated from Indonesian | Economy
A Glimmer of Hope Behind the Completion of AMMAN's Smelter in West Sumbawa
Image: Media Indonesia

The skies over Maluk Village, West Nusa Tenggara, are still dark around 5:30 AM when the roar of diesel minibus engines signals the start of the day. Pak Den, a middle-aged driver, is behind the wheel, warming up his vehicle to transport employees to their work sites, including the Batu Hijau mining area. For over two years, his routine has been consistent: shuttling dozens of workers between local lodgings and the mining facilities.

Currently working as a driver for a company involved in constructing facilities within the copper and gold mining area, Pak Den enjoys a stable income above the regional minimum wage, complete with benefits such as overtime incentives, social security (BPESS), and religious holiday allowances (THR). This stability has allowed him to fund his child’s university education at the University of Mataram. However, despite his current success, Pak Den harbours anxiety regarding his future once his current contract ends, noting that at 57, he may struggle to compete with younger, more energetic applicants for future roles.

The completion of PT Amman Mineral Internasional Tbk’s (AMMAN) smelter in West Sumbawa Regency officially signifies that concentrate will no longer be sent abroad but processed domestically. This milestone was confirmed through the signing of the Completion and Project Acceptance Certificate (PAC) between AMMAN and its strategic partner, China Nonferrous Metal Industry’s Foreign Engineering and Construction Co., Ltd. (NFC), in Beijing on 18 July 2024.

This development brings fresh momentum to the economy of West Nusa Tenggara (NTB). By adding value to the processing of concentrate into copper, gold, and silver cathodes, the province can increase regional revenue and generate new employment opportunities. Furthermore, the smelter’s construction is driving infrastructure improvements in NTB, including roads, ports, and energy, which in turn attracts further investment. An example of this is the airport built by the West Sumbawa Regency Government in collaboration with AMMAN in Kiantar Village.

Economic observer from the University of Mataram, Firmansyah, suggests that once the smelter is operational, NTB will possess two prestigious industrial zones: the Mandalika Special Economic Zone for tourism in Lombok, and the mining industrial zone in Sumbawa. He emphasised that the success of these zones depends on effective management, ensuring that supply chain management is sustainable and that local products and labour are effectively integrated into the industry.

More from 31 July 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/a-glimmer-of-hope-behind-the-completion-of-ammans-smelter-in-west-sumbawa-1785484459)
Originally published by Media Indonesia (https://mediaindonesia.com/nusantara/916841/secercah-harapan-di-balik-rampungnya-smelter-amman-di-sumbawa-barat), translated from Indonesian
Print