41% Power Reserve: PLN West Java Assures Electricity Supply for MSMEs and Industry
Bandung (ANTARA) — PLN’s West Java Distribution Main Unit (UID) has assured the public that the electricity system in Tatar Pasundan is secure, with a power reserve of 6,928.95 megawatts (MW), or around 41%, to support productivity among micro, small and medium-sized enterprises (MSMEs) and industry.
Krisantus H Setyawan, senior manager for communications and general affairs at PLN UID West Java, said in Bandung on Friday that a reliable energy supply was an important asset in serving growing electricity demand from households, businesses, industry and MSMEs.
“On the supply side, West Java’s electricity system currently has sufficient capacity. As of October 2026, available supply capacity stood at 16,789.95 MW, while the highest recorded peak load was 9,861 MW. This means a reserve of 6,928.95 MW remains, or around 41% of total available capacity,” Krisantus said in a text message to ANTARA.
He said PLN was fully committed to providing a reliable, high-quality electricity supply to all customers, including MSMEs.
Electricity plays a vital role in supporting productivity and business continuity, from production and the use of equipment to digital marketing and customer service.
For MSMEs, a reliable power supply is a key factor in ensuring operations run effectively. Alongside programmes to empower businesses through its Social and Environmental Responsibility (TJSL) initiative, PLN is continuing to ensure the readiness of its electricity infrastructure and services to accelerate local economic growth.
Dessy Nur Anisa Rahma, founder and chief executive of PUKA (Pulas Katumbiri), a disability-inclusive craft business, agreed on the importance of a reliable electricity supply.
She said the business produces around 1,000 handmade items by people with disabilities each month, and relies on electricity to run its production machinery.
“Some processes use electricity, but it accounts for only 40% of each product. Items such as bags, pouches and lamps are sewn using machines,” Dessy said in Bandung on Tuesday (3 November), describing the share of PUKA’s production that depends on electric machinery.
Dessy acknowledged that PUKA’s production schedule had been disrupted when parts of Bandung experienced scheduled power cuts some time ago, forcing the business to adjust its working hours.
“Yes, we were affected, but we anticipated it by starting work earlier. By the time the scheduled outage began, we had already stopped using electricity,” Dessy said.
In response to the importance of electricity for business operations, Krisantus stressed that sufficient supply alone was not enough without high-quality distribution.
“Having enough supply is of course not sufficient on its own. PLN is also strengthening network reliability through regular infrastructure maintenance, improvements to service quality and ensuring personnel are ready to anticipate and respond quickly to any potential disruption,” he said.
These layered mitigation and maintenance measures are intended to ensure a stable electricity supply, without significant technical problems for businesses.
“We want to ensure that electricity is not only available, but also gives people confidence and certainty as they go about their activities, including MSMEs whose productivity depends on electricity,” Krisantus said.
By combining a guaranteed energy supply with its TJSL empowerment programmes, PLN is positioning electricity as a key driver of the regional economy.
“Ultimately, PLN’s commitment is to provide electricity as a driver of economic growth. In line with our efforts to empower MSMEs through TJSL, we hope reliable electricity will create more business opportunities, raise productivity and promote economic self-reliance among the people of West Java,” he added.
Source: jawawa.id (https://jawawa.id/newsitem/41-power-reserve-pln-west-java-assures-electricity-supply-for-msmes-and-industry-1793973156)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5837107/cadangan-daya-41-persen-pln-jabar-jamin-listrik-umkm-dan-industri), translated from Indonesian