Indonesian Political, Business & Finance News

30 Ende Regional Hospital Buildings Inspected Post-Earthquake, 28 Declared Fit for Reuse

| | Source: Media Indonesia Translated from Indonesian | Infrastructure
30 Ende Regional Hospital Buildings Inspected Post-Earthquake, 28 Declared Fit for Reuse
Image: Media Indonesia

The Ministry of Public Works, through the Directorate General of Human Settlements, is accelerating post-earthquake building reliability inspections in East Nusa Tenggara, particularly for healthcare facilities that are vital to restoring basic public services. In Ende Regency, the Building Reliability Assessment Team has inspected 30 buildings at Ende Regional Hospital. The results showed 28 buildings were classified as Green, meaning they can be reused, while two buildings were classified as Yellow, meaning they can be used on a limited basis. These findings provide certainty for health workers, patients, and their families regarding which buildings can be safely reoccupied. In Sikka Regency, inspections were carried out at T.C. Hillers Hospital, where all buildings examined were declared Green and fit for reuse.

Minister of Public Works Dody Hanggodo stated that certainty regarding the condition of healthcare facility buildings is a crucial part of accelerating post-earthquake recovery, as health services must continue while ensuring the safety of the public and health workers. “In post-disaster handling, we are not only pursuing speed of recovery but also ensuring that buildings returned to use have been inspected. Healthcare facilities must be able to serve the public safely and comfortably,” he said in an official statement on Sunday (23/8). He explained that the assessment results in Ende and Sikka show each building has different conditions and levels of utilisation. Therefore, inspections were conducted specifically on each building to determine the level of use based on field assessments.

In addition to healthcare facilities, assessments were also conducted on government buildings. In Ende Regency, two buildings of the Ende Regent’s Office were declared Green and fit for reuse. In Sikka Regency, three buildings of the Sikka Regent’s Office were declared Yellow, meaning they can be used on a limited basis. The differing results highlight the importance of building reliability assessments as a basis for post-earthquake decision-making. Buildings declared Green can be reused, while those categorised as Yellow can be utilised with restrictions in accordance with inspection findings and technical recommendations.

The Ministry of Public Works continues to prioritise inspections of buildings with vital functions for the public, especially healthcare facilities. This approach ensures that post-earthquake recovery is not solely focused on physical restoration of buildings but also on restoring basic public service functions as quickly as possible. With these assessment results, healthcare facilities in Ende and Sikka now have a technical basis to gradually resume service activities in buildings declared fit for reuse, while ensuring restrictions are applied to buildings requiring limited use.

More from 23 August 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/30-ende-regional-hospital-buildings-inspected-post-earthquake-28-declared-fit-for-reuse-1787507422)
Originally published by Media Indonesia (https://mediaindonesia.com/nusantara/925158/30-gedung-rsud-ende-diperiksa-pascagempa-28-dinyatakan-bisa-digunakan-kembali), translated from Indonesian
Print