{
    "success": true,
    "data": {
        "id": 1352902,
        "msgid": "wb-aid-allegedly-corrupted-1447899208",
        "date": "2003-10-20 00:00:00",
        "title": "WB aid allegedly corrupted ",
        "author": null,
        "source": "JP",
        "tags": null,
        "topic": null,
        "summary": "WB aid allegedly corrupted TANGERANG: The Tangerang Municipality's Control Body (Bawasda) will investigate the alleged misappropriation of Rp 1.5 billion (US$176,470) allocated to install a website network in administration offices since 2001. The case arose when the World Bank, which donated Rp 1.3 billion for the work, asked for a report on the project.",
        "content": "<p>WB aid allegedly corrupted<\/p>\n<p>TANGERANG: The Tangerang Municipality&apos;s Control Body (Bawasda) <br>\nwill investigate the alleged misappropriation of Rp 1.5 billion <br>\n(US$176,470) allocated to install a website network in <br>\nadministration offices since 2001.<\/p>\n<p>The case arose when the World Bank, which donated Rp 1.3 <br>\nbillion for the work, asked for a report on the project.<\/p>\n<p>Dedi Rosadi, a municipality official, said the project, which <br>\nwas to have begun in 2001, was not yet complete because &quot;the <br>\nadministration hasn&apos;t appointed a website master&quot;.<\/p>\n<p>&quot;Besides, we don&apos;t have a web server yet ... worse, several <br>\ndistrict offices still do not have fixed-line telephones,&quot; he <br>\nsaid over the weekend.<\/p>\n<p>Another official connected to the project, Dadang Durahman, <br>\nsaid the administration had used Rp 600 million of the Rp 1.5 <br>\nbillion to establish a community hot line, while the remaining <br>\nmoney had been used to computerize data at the municipality&apos;s <br>\nCapital Investment and Permit Office. -- JP<\/p>\n<p>;JP;BBY;Tempointeraktif;<br>\nANPAj..r..<br>\nGreater-flooding-Bogor<br>\nConstruction site hit by heavy rain<br>\nJP\/8\/G-RUKO<\/p>\n<p>Construction site hit by heavy rain<\/p>\n<p>BOGOR: Six blocks of two-story shop-houses buildings -- <br>\nintended to be shops with upstairs living arrangements -- under <br>\nconstruction on Jl. Tajur alongside the Cibalok River, collapsed <br>\non Saturday evening when the river flooded, following heavy rain.<\/p>\n<p>No fatalities were reported, as all the construction workers <br>\nleft the building site for an early dinner at about 5 p.m.<\/p>\n<p>Raymond, a resident who witnessed the incident, told <br>\nTempointeraktif that the flood brought down the 20-meter iron <br>\nrods used to reinforce the buildings.<\/p>\n<p>The construction site, reportedly owned by businessman <br>\nRanuwijaya, violates regulations stipulating buildings must be <br>\nsituated at least 50 meters away from the riverbank.<\/p>\n<p>But despite the resident&apos;s objections the construction <br>\nproceeded after the administration issued a permit. -- JP<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/wb-aid-allegedly-corrupted-1447899208",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}