{
    "success": true,
    "data": {
        "id": 1778818,
        "msgid": "uluwatu-traffic-engineering-trial-begins-several-access-points-now-closed-1780880260",
        "date": "2026-06-02 10:02:08",
        "title": "Uluwatu Traffic Engineering Trial Begins, Several Access Points Now Closed",
        "author": "",
        "source": "DETIK_BALI",
        "tags": "",
        "topic": "Infrastructure",
        "summary": "The Badung Transportation Agency has implemented a one-month traffic engineering trial in the Uluwatu area of Bali to alleviate chronic congestion. The trial involves specific road closures and directional restrictions during peak hours, with officials set to evaluate the impact after 14 days.",
        "content": "<p>A trial for traffic engineering has officially commenced in the\nUluwatu area, South Kuta, Badung, Bali, starting today, Tuesday\n(2\/6\/2026). Several vehicle access points are being restricted or\nprohibited during peak hours to alleviate the chronic congestion\nfrequently reported by motorists.<\/p>\n<p>The Badung Transportation Agency (Dishub) is implementing this\ntraffic engineering scheme for one month at several congestion-prone\npoints, particularly in the Jalan Toya Ning and Belimbing Sari areas.\nThe flow restrictions are in effect daily from 2:00 PM to 10:00 PM\nWITA.<\/p>\n<p>Motorists must now take detours due to turn prohibitions and access\nrestrictions at several intersections. The specific points of the\ntraffic engineering implementation are as follows:<\/p>\n<p>Traffic Restriction Points:<\/p>\n<ul>\n<li><p>Jalan Uluwatu to Jalan Toya Ning II: Drivers from the direction\nof Jalan Uluwatu are prohibited from turning directly towards Jalan Toya\nNing II.<\/p><\/li>\n<li><p>Jalan Toya Ning III to Jalan Raya Uluwatu: Vehicles from the\ndirection of Jalan Toya Ning III are prohibited from turning right when\nentering Jalan Raya Uluwatu.<\/p><\/li>\n<li><p>Baler Setra Road - Belimbing Sari Road Intersection: Specifically\nfor four-wheeled vehicles or larger, in addition to motorcycles,\nmovement towards the west towards Jalan Uluwatu is prohibited.<\/p><\/li>\n<\/ul>\n<p>Outside the hours of 2:00 PM to 10:00 PM WITA, traffic flow will\nreturn to normal.<\/p>\n<p>The Head of the Badung Transportation Agency, AA Gde Ngurah Rahmadi,\nstated that several supporting facilities have been installed to assist\nthe implementation of the traffic engineering, including prohibition\nsigns, alternative route guidance boards, and traffic cones or\ndelineators at various points. Officers have also been deployed in the\nfield to assist with traffic management and provide information to the\npublic.<\/p>\n<p>\u201cWe will conduct an evaluation at the earliest 14 days after\nimplementation. The evaluation will be carried out if adjustments to the\nimplemented traffic engineering pattern are required,\u201d explained\nRahmadi.<\/p>\n<p>The Badung Transportation Agency urges the public to obey traffic\nsigns, follow the directions of officers in the field, and use the\nprovided alternative routes. \u201cParticipation and compliance are key to\nthe success of this traffic engineering. This is to ensure traffic that\nis safe, orderly, and, of course, smooth, as we all desire in Badung,\u201d\nhe emphasised.<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/uluwatu-traffic-engineering-trial-begins-several-access-points-now-closed-1780880260",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}