{
    "success": true,
    "data": {
        "id": 1021631,
        "msgid": "suramadu-bridge-construction-ready-to-roll-1447893297",
        "date": "1994-04-14 00:00:00",
        "title": "Suramadu bridge construction ready to roll",
        "author": null,
        "source": "JP",
        "tags": null,
        "topic": null,
        "summary": "Suramadu bridge construction ready to roll JAKARTA (JP): Six ministers and the commander of the armed forces gathered at the Ministry of Public Works here yesterday to discuss the latest developments on the Suramadu bridge, a planned six-kilometer bridge to connect Surabaya in East Java and Madura island.",
        "content": "<p>Suramadu bridge construction ready to roll<\/p>\n<p>JAKARTA (JP): Six ministers and the commander of the armed <br>\nforces gathered at the Ministry of Public Works here yesterday to <br>\ndiscuss the latest developments on the Suramadu bridge, a planned <br>\nsix-kilometer bridge to connect Surabaya in East Java and Madura <br>\nisland.<\/p>\n<p>Some of the accomplished preparations include the land <br>\ntopographic and geomarine study by PT Virama Karya, a state-owned <br>\nengineering company, the sample technical test study by the <br>\nresearch center of the Bandung Institute of Technology, the <br>\nSurabaya Institute of Technology and the Gajah Mada University <br>\nand the acquisition of 5.8 hectares of land in Madura and 6.6 <br>\nhectares in Surabaya on March 31.<\/p>\n<p>The bridge design made by PT Bina Karya, Parson Politech Inc <br>\nand Hallcrow and Partners, has also been completed.<\/p>\n<p>The ministry also studied the water supply at Bangkalan in <br>\nMadura, which will supply the project with 2.1 cubic meters of <br>\nwater per second, which will be used to help build the bridge.<\/p>\n<p>At the press conference Radinal refused to explain when <br>\nconstruction will begin, as it has yet to be set. State Minister <br>\nfor Research and Technology B.J. Habibie will have a hand in this <br>\nstep when he returns from Japan in June.<\/p>\n<p>Radinal said that the project will need Rp 500 billion <br>\n(US$233.1 million), of which Rp 450 billion will finance the <br>\nbridge construction, Rp 15 billion for toll equipment and Rp 35 <br>\nbillion for bridge components.<\/p>\n<p>Financing<\/p>\n<p>The project will be 80 percent financed by the Overseas <br>\nEconomic Corporation Fund (OECF) of Japan, 12 percent by the <br>\ncentral bank (Bank Indonesia) and eight percent by an Indonesian-<br>\nJapanese consortium.<\/p>\n<p>He said that the Indonesian consortium members are PT PAL, a <br>\nstate-owned shipbuilding company, PT Krakatau Steel, a state-<br>\nowned steel company, PT SIER, a Surabaya-based state-owned <br>\nindustrial estate company, PT Jasa Marga, a state owned toll road <br>\ncompany and PT Dipa Madura Pradana, a private company chaired by <br>\nMoh. Noer, former governor of East Java.<\/p>\n<p>The consortium may also include some Japanese companies such <br>\nas Mitsubishi Corp, Itochu Corp, Shimizu Corp, Mitsui and Long <br>\nTerm Credit bank (LTCB).<\/p>\n<p>He said the bridge will be operated under the Build-Operation-<br>\nTransfer (BOT) system for 30 years.<\/p>\n<p>The meeting was attended by Habibie, State Minister of <br>\nAgrarian Affairs Soni Harsono, State Minister of Public Housing <br>\nAkbar Tandjung, Minister of Tourism, Post and Telecommunications <br>\nJoop Ave, State Minister of Investment Sanyoto Sastrowardoyo and <br>\nCommander of the Armed Forces Gen. Feisal Tanjung.(03)<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/suramadu-bridge-construction-ready-to-roll-1447893297",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}