{
    "success": true,
    "data": {
        "id": 1197547,
        "msgid": "subway-project-approved-1447893297",
        "date": "1995-02-17 00:00:00",
        "title": "Subway project approved",
        "author": null,
        "source": "",
        "tags": null,
        "topic": null,
        "summary": "Subway project approved JAKARTA (JP): President Soeharto instructed Transportation Minister Haryanto Dhanutirto yesterday to go ahead with the building of a subway and an elevated railway to help ease the increasingly chaotic traffic in the capital. The President's instruction ended a lengthy controversy on whether there should be an underground or elevated system in the Mass Rapid Transit development in Jakarta, which has a population of about nine million.",
        "content": "<p>Subway project approved<\/p>\n<p>JAKARTA (JP): President Soeharto instructed Transportation<br>\nMinister Haryanto Dhanutirto yesterday to go ahead with the<br>\nbuilding of a subway and an elevated railway to help ease the<br>\nincreasingly chaotic traffic in the capital.<\/p>\n<p>The President's instruction ended a lengthy controversy on<br>\nwhether there should be an underground or elevated system in the<br>\nMass Rapid Transit development in Jakarta, which has a population<br>\nof about nine million.<\/p>\n<p>Haryanto told reporters after meeting with the President that<br>\nthe construction of the subway will be tendered, while that of<br>\nthe elevated railway will be awarded to PT Citra Lamtoro Gung<br>\nPersada which is owned by Siti Hardiyanti Rukmana.<\/p>\n<p>The minister said that the basic design for the subway is<br>\ncurrently being prepared by a project management unit assigned by<br>\nthe government in cooperation with the National Development<br>\nPlanning Board and the Jakarta administration.<\/p>\n<p>\"The construction of the subway, which will link Blok M in<br>\nSouth Jakarta and downtown Kota in West Jakarta, is expected to<br>\nstart early next year as soon as the design is completed followed<br>\nby its tender,\" he said.<\/p>\n<p>A number of consortia from France, Canada, Japan, the United<br>\nStates, Germany and Australia have reportedly expressed interest<br>\nin participating in the tender for the construction of the subway<br>\nproject, which is estimated to cost over US$1 billion.<\/p>\n<p>Haryanto said that the construction of the elevated railway,<br>\nwhich will cost about $800 million, will be wholly financed by PT<br>\nCitra Lamtoro Gung.<\/p>\n<p>\"The elevated railway will link Cinere and Kebayoran Lama,<br>\nboth in South Jakarta, and will later be operated by the state<br>\nrailway company Perusahaan Umum Kereta Api under a joint<br>\noperation scheme,\" he said.<\/p>\n<p>Under such a scheme, there will be a technical unit whose<br>\npresident will be a railway employee, while the financial<br>\ndirector will be from PT Citra Lamtoro Gung, he said.<\/p>\n<p>According to the minister, the elevated railway will operate<br>\nbetween Kebayoran Lama and Cinere through Pondok Indah and Lebak<br>\nBulus and not between Kota and Cinere as was reported previously.<\/p>\n<p>Siti Hardiyanti Rukmana is the President's eldest daughter.<br>\n(hhr)<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/subway-project-approved-1447893297",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}