{
    "success": true,
    "data": {
        "id": 1528399,
        "msgid": "pt-tripatra-wins-316-million-contract-1447893297",
        "date": "1997-03-27 00:00:00",
        "title": "PT Tripatra wins $316 million contract",
        "author": null,
        "source": "ANTRARA",
        "tags": null,
        "topic": null,
        "summary": "PT Tripatra wins $316 million contract JAKARTA (Antara): PT Tripatra Engineers and Constructors has been awarded a contract worth US$316 million to build a liquefied natural gas (LNG) production facility for Mobil Exploration in Arun, Lhokseumawe, Aceh province. The contract to construct the North Sumatera Offshore \"A\" (NSO A) plant was signed here Tuesday. According to Tripatra president Pandri Prabowo, construction of the project would be carried out in three stages.",
        "content": "<p>PT Tripatra wins $316 million contract<\/p>\n<p>JAKARTA (Antara): PT Tripatra Engineers and Constructors has<br>\nbeen awarded a contract worth US$316 million to build a liquefied<br>\nnatural gas (LNG) production facility for Mobil Exploration in<br>\nArun, Lhokseumawe, Aceh province.<\/p>\n<p>The contract to construct the North Sumatera Offshore \"A\" (NSO<br>\nA) plant was signed here Tuesday.<\/p>\n<p>According to Tripatra president Pandri Prabowo, construction<br>\nof the project would be carried out in three stages.<\/p>\n<p>Firstly, building of an offshore production platform,<br>\nsecondly, construction of a marine pipeline, and the last stage<br>\nwill involve the building of an onshore gas purification plant.<\/p>\n<p>The 5,500-ton offshore platform will be erected in a depth of<br>\n108 meters in a location 100 kilometers northeast of Lhokseumawe.<\/p>\n<p>The gas produced by the platform will be transported through<br>\nthe 100 km pipeline to the purification plant for processing into<br>\nliquefied natural gas.<\/p>\n<p>The plant will have a production capacity of 450 million cubic<br>\nfeet per day (cfg\/d), and the by products, including sulphur,<br>\nwill reach 236 tons per day.<\/p>\n<p>At the NSO A project several other sophisticated equipment<br>\nwill also be installed, like a distribution control system (DCS)<br>\nwhich will control and monitor the activities of the offshore<br>\nplatform from the land, he said.<\/p>\n<p>Pandri said the LNG produced by NSO A, scheduled to be<br>\noperational in July 1999, will be added to the current LNG<br>\nproduced in Arun.<\/p>\n<p>Under the contract, Tripatra acted as main contractor in<br>\ncooperation with PT Mc Dermott Indonesia and Toyo Engineering<br>\nCorp. of Japan.<\/p>\n<p>The \"turn-key\" project is the third major contract awarded to<br>\nTripatra under a production sharing contract between Mobil<br>\nExploration and the state oil company Pertamina.<\/p>\n<p>Earlier, Tripatra signed a contract with Mobil to build an<br>\nArun Booster Compression unit worth $US326 million and a similar<br>\nproject in southern Lhokseumawe valued at $US36<br>\nmillion.<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/pt-tripatra-wins-316-million-contract-1447893297",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}