{
    "success": true,
    "data": {
        "id": 1339605,
        "msgid": "preparations-mount-as-busway-begins-trial-period-1447893297",
        "date": "2003-03-03 00:00:00",
        "title": "Preparations mount as busway begins trial period",
        "author": null,
        "source": "JP",
        "tags": null,
        "topic": null,
        "summary": "Preparations mount as busway begins trial period Novan Iman Santosa, The Jakarta Post, Jakarta The city administration finally started the trial period of its long-awaited busway project, temporarily called TransJakarta, last Friday as two trial buses made the first public appearance of an expected fleet of 60 buses to ply the route linking Blok M in South Jakarta and Kota in West Jakarta.",
        "content": "<p>Preparations mount as busway begins trial period<\/p>\n<p>Novan Iman Santosa, The Jakarta Post, Jakarta<\/p>\n<p>The city administration finally started the trial period of its<br>\nlong-awaited busway project, temporarily called TransJakarta,<br>\nlast Friday as two trial buses made the first public appearance<br>\nof an expected fleet of 60 buses to ply the route linking Blok M<br>\nin South Jakarta and Kota in West Jakarta.<\/p>\n<p>But many questions remain as to whether the new public<br>\ntransportation system will be a success or will end up as another<br>\nill-fated white elephant.<\/p>\n<p>Early signs of possible failure emerged as the City<br>\nTransportation Agency was forced to postpone the busway trial<br>\nperiod several times since last October.<\/p>\n<p>Experts and activists say the repeated delays are signs that<br>\nthe agency does not have a solid concept but officials say that<br>\nit was simply because they were trying to accommodate all inputs.<\/p>\n<p>\"We were made aware that there were so many loopholes in the<br>\ninitial design so we postponed the launch of the trial period,\"<br>\nhead of the agency's traffic engineering division, Udar Pristono,<br>\ntold reporters on the sidelines of the trial period launch at<br>\nCity Hall.<\/p>\n<p>\"This project is aimed at providing a reliable and convenient<br>\nmode of transportation for residents from the middle and lower<br>\nincome groups so we must prepare it well.\"<\/p>\n<p>Ordinary buses need some 120 minutes on the 12.9-kilometer<br>\nBlok M-Kota route for a round trip while the busway will only<br>\nneed some 90 minutes as it would run along a dedicated lane.<\/p>\n<p>\"Not only will passengers enjoy faster travel, they will also<br>\nfind it more comfortable and convenient as the buses are air-<br>\nconditioned and have a reliable headway of between one and a half<br>\nminutes to five minutes.<\/p>\n<p>\"Such a short headway means that passengers will not have to<br>\nwait too long if they miss the bus while at the same time<br>\nincreasing the busway capacity.\"<\/p>\n<p>The fare is set at Rp 2,500 (28 U.S. cents) while current bus<br>\nfares range from Rp 900 to Rp 3,500 depending on the bus type.<\/p>\n<p>Pristono said that demand on the Blok M-Kota route was about<br>\n12,600 passengers per hour in one direction.<\/p>\n<p>Currently the agency is testing two different buses to see<br>\nwhich one is better suited for the project, the Japanese Hino and<br>\nGerman Mercedes Benz.<\/p>\n<p>The Hino bus has 31 seats and the Mercedes Benz has 30 seats.<br>\nBoth have a capacity of 55 standing passengers each.<\/p>\n<p>The buses have doors on both sides to accommodate various<br>\nsituations along the route. It is planned that the shelters will<br>\nbe in the right-hand side of the bus from Blok M until Harmoni in<br>\nWest Jakarta. Entering Jl. Gajah Mada in West Jakarta, the buses<br>\nwill use the left-hand side doors.<\/p>\n<p>There will be 21 stops along the route served by 39 shelters<br>\nas there are several combined shelters to serve both directions.<\/p>\n<p>Busway rapid transit (BRT) is a common, widely-applied system<br>\nin Latin American cities such as Bogota, the capital city of<br>\nColombia; Curitiba, a city of Brazil; and Quito, the capital city<br>\nof Equador.<\/p>\n<p>Governor Sutiyoso is slated to visit Bogota to observe the<br>\nTransMilenio busway system, which was started on Dec. 18, 2000,<br>\nsome time in March.<\/p>\n<p>Agency officials had visited Bogota to learn the system and<br>\nimplement any possible principles here.<\/p>\n<p>TransMilenio's official website www.transmilenio.gov.co<br>\nreveals that the first phase includes three routes totaling some<br>\n41 kilometers constructed between 1998 and 2001.<\/p>\n<p>There are three five-year stages until 2016 when the system is<br>\nexpected to reach all districts of Bogota encompassing 387.9<br>\nkilometers.<\/p>\n<p>Pristono told The Jakarta Post that TransJakarta would have a<br>\ntotal of 12 routes when it is fully operational.<\/p>\n<p>\"The second route will serve the Hotel Indonesia traffic<br>\ncircle in Central Jakarta and Rawamangun in East Jakarta. We will<br>\nstudy this route once the Blok M-Kota is running well,\" he said.<\/p>\n<p>In contrast to TransMilenio's clear time frame, Pristono said<br>\nhe could not give a clear time frame for the project or how many<br>\nkilometers of road were involved.<\/p>\n<p>Further homework for city officials will be how to teach the<br>\nresidents to use this new system as people have to be taught to<br>\nqueue and buy tickets before entering the shelters.<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/preparations-mount-as-busway-begins-trial-period-1447893297",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}