{
    "success": true,
    "data": {
        "id": 1623013,
        "msgid": "pln-prepares-38-posts-to-ensure-electricity-reliability-during-eid-in-kalselteng-1773838307",
        "date": "2026-03-18 19:29:35",
        "title": "PLN prepares 38 posts to ensure electricity reliability during Eid in Kalselteng",
        "author": "",
        "source": "ANTARA_ID",
        "tags": "",
        "topic": "Energy",
        "summary": "PT PLN's Distribution Unit for South and Central Kalimantan has deployed 38 posts across strategic locations in the two provinces to maintain electricity supply during the 2026 Eid al-Fitr celebrations. The initiative includes 18 mudik posts and security for 184 vital sites such as public facilities and community centres, with management conducting inspections to verify personnel readiness and equipment. This effort underscores PLN's commitment to safety and reliable service amid the holiday travel peak, ensuring uninterrupted power for essential operations.",
        "content": "<p>Palangka Raya - PT PLN (Persero) Distribution Business Unit for South\nKalimantan and Central Kalimantan (Kalselteng) is ensuring the\nreliability of electricity supply during Eid al-Fitr 1447 Hijriah\/2026\nby preparing 38 posts distributed across the two provinces. \u201cPLN UID\nKalselteng has also prepared 38 distribution handling post locations and\n18 mudik posts spread across various strategic points. In addition,\nsecurity efforts are focused on 184 other important locations, such as\ncommunity activity centres, public facilities, and vital objects,\u201d said\nthe General Manager of PLN UID Kalselteng, Iwan Soelistijono, when\ncontacted in Palangka Raya on Wednesday. He also assured the reliability\nof electricity ahead of the Eid al-Fitr celebration by conducting direct\ninspections at several Ramadan and Eid preparedness posts. During the\nactivity, the management team reviewed various important aspects,\nincluding personnel readiness, completeness of work equipment, and\nsupporting facilities used to support field post operations. \u201cThrough\nthis visit, we ensure that all personnel are always ready to provide the\nbest service to the community, both in handling potential electrical\ndisturbances and in supporting the smooth travel of the public during\nthe mudik moment,\u201d said Iwan. In addition, the management reminded all\nofficers to always prioritise electrical safety aspects in every task\nimplementation, as the main foundation in maintaining operational\nreliability in the field.<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/pln-prepares-38-posts-to-ensure-electricity-reliability-during-eid-in-kalselteng-1773838307",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}