{
    "success": true,
    "data": {
        "id": 1060560,
        "msgid": "pln-pertamina-to-build-geothermal-power-plant-1447893297",
        "date": "1996-04-24 00:00:00",
        "title": "PLN, Pertamina to build geothermal power plant",
        "author": null,
        "source": "JP",
        "tags": null,
        "topic": null,
        "summary": "PLN, Pertamina to build geothermal power plant JAKARTA (JP): The state-owned electric company PLN and the state-owned oil firm Pertamina will set up a joint venture to build and operate a geothermal power station. A spokesman for the Ministry of Mines and Energy, P.",
        "content": "<p>PLN, Pertamina to build geothermal power plant<\/p>\n<p>JAKARTA (JP): The state-owned electric company PLN and the<br>\nstate-owned oil firm Pertamina will set up a joint venture to<br>\nbuild and operate a geothermal power station.<\/p>\n<p>A spokesman for the Ministry of Mines and Energy, P. Sopacua,<br>\nin correcting a story which appeared in The Jakarta Post's April<br>\n20 edition, said that the planned joint venture will not be<br>\nestablished by state-owned tin mining company PT Tambang Timah<br>\nand state-owned general mining company PT Aneka Tambang.<\/p>\n<p>An official at the ministry said that the two mining firms<br>\nwill instead set up a joint venture for gold mining and<br>\nexploration in Kalimantan.<\/p>\n<p>Secretary-general of the Ministry of Mines and Energy Umar<br>\nSaid said that Aneka Tambang and Tambang Timah have already signed<br>\na memorandum of understanding on the gold project, whose interest<br>\nwill be equally owned by the two firms.<\/p>\n<p>Umar said that PLN and Pertamina have yet to discuss the<br>\ndetails of the power project which they will establish.<br>\nHe noted that the joint venture will be called PT Geothermal<br>\nIndonesia.<\/p>\n<p>According to official data, Indonesia's potential geothermal<br>\nenergy reserves will be able to support the operation of power<br>\nplants which will have a total capacity of 19,658 megawatts.<br>\nUntil now, only about 1,000 megawatts of capacity have been<br>\nutilized.<\/p>\n<p>He pointed out that the two planned joint ventures are to be<br>\nestablished under the so-called \"cross fertilization\" scheme,<br>\nwhich calls for cooperation between state-owned enterprises or<br>\nbetween state-owned enterprises and private firms.<\/p>\n<p>\"In the near future, we'll see more such business cooperation<br>\nestablished in order to improve the efficiency of the state-owned<br>\ncompanies,\" he said. (13)<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/pln-pertamina-to-build-geothermal-power-plant-1447893297",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}