{
    "success": true,
    "data": {
        "id": 1540076,
        "msgid": "mobils-petrochem-project-1447893297",
        "date": "1997-05-29 00:00:00",
        "title": "Mobil's petrochem project",
        "author": null,
        "source": "DPA",
        "tags": null,
        "topic": null,
        "summary": "Mobil's petrochem project SINGAPORE (DPA): Mobil appears poised to go ahead with plans to build a multi-billion dollar petrochemical complex in Singapore, a news report in the island republic said yesterday. Mobil's plans include a petrochemical cracker plant able to supply six to eight secondary or \"downstream\" partners, the Business Times newspaper reported.",
        "content": "<p>Mobil&apos;s petrochem project<\/p>\n<p>SINGAPORE (DPA): Mobil appears poised to go ahead with plans<br>\nto build a multi-billion dollar petrochemical complex in<br>\nSingapore, a news report in the island republic said yesterday.<\/p>\n<p>Mobil&apos;s plans include a petrochemical cracker plant able to<br>\nsupply six to eight secondary or &quot;downstream&quot; partners, the<br>\nBusiness Times newspaper reported.<\/p>\n<p>The plant is likely to join similar facilities being built by<br>\nExxon and the Petrochemical Corporation of Singapore on a group<br>\nof islands off the Singapore coast, fitting in with the<br>\ngovernment&apos;s plans for a massive petroleum\/petrochemical zone in<br>\nthe area.<\/p>\n<p>The Mobil cracker is expected to have a capacity of some<br>\n800,000 to one million tons of ethylene and 300,000 tons of<br>\npropylene per year, roughly equal to the capacity of the Exxon<br>\nplant currently being built on a small island off Singapore&apos;s<br>\ncoast.<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/mobils-petrochem-project-1447893297",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}