{
    "success": true,
    "data": {
        "id": 1675098,
        "msgid": "mind-id-targets-gold-production-increase-to-31-7-tonnes-in-2026-1776091856",
        "date": "2026-04-13 21:20:05",
        "title": "MIND ID Targets Gold Production Increase to 31.7 Tonnes in 2026",
        "author": "",
        "source": "CNBC",
        "tags": "",
        "topic": "Mining",
        "summary": "MIND ID, the state-owned mining industry holding, has set an ambitious target for 2026, aiming to boost gold production by 6% to 31.7 tonnes through enhanced operations at PT Antam and PT Freeport Indonesia. The company also projects significant growth in other commodities, including a 63% rise in tin to 29,100 tonnes by PT Timah, an 89% increase in bauxite to 5.3 million wet metric tonnes, and a 33% jump in nickel ore to 24.4 million wet metric tonnes, reflecting a strategic focus on downstream processing and operational efficiency. This optimistic outlook underscores MIND ID's commitment to sustainable value creation and substantial contributions to Indonesia's national economy.",
        "content": "<p>Jakarta, CNBC Indonesia - The state-owned mining industry holding\nMIND ID has set a fairly optimistic target for the performance of its\nholding members in 2026. For example, for the gold commodity, the\ncompany targets a 6% production increase to 31.7 tonnes from 29.9 tonnes\nof gold in 2025.<\/p>\n<p>MIND ID\u2019s President Director Maroef Sjamsoeddin stated that MIND ID\npositions 2026 as a strategic foundation to strengthen the\nsustainability and optimisation of the company\u2019s portfolio value.<\/p>\n<p>\u201cFor gold, PT Antam and PT Freeport Indonesia, MIND ID targets an\nincrease to 6% supported by improved operational performance,\u201d said\nMaroef during a Hearing with Commission XII of the House of\nRepresentatives, on Monday (13\/4\/2026).<\/p>\n<p>Meanwhile, for Antam\u2019s ferronickel, it is targeted to rise 14% to\n18,400 tonnes. Then for the aluminium commodity, for 2026, MIND ID has\nset a target of 275,000 tonnes with a focus on operational\nstabilisation.<\/p>\n<p>Next, for the coal commodity through PT Bukit Asam Tbk (PTBA), it is\ntargeted to increase 5% to 49.5 million tonnes from the 2025 realisation\nof 47.2 million tonnes. This reflects the stability of demand and the\ncompany\u2019s production optimisation efforts.<\/p>\n<p>Furthermore, for bauxite ore through Antam, it is targeted to\nincrease by 89% to 5.3 million wet metric tonnes. This aligns with MIND\nID\u2019s ongoing bauxite downstreaming strategy.<\/p>\n<p>Then, for nickel matte through PT Vale Indonesia (PTVI), the target\nis set at 68,000 tonnes, in line with the maintenance plans for the\nSorowako plant of PT Vale Indonesia.<\/p>\n<p>Meanwhile, nickel ore from PT Antam and PT Vale Indonesia is set to\nrise significantly by 33% to 24.4 million wet metric tonnes, driven by\nthe start of production operations in the Bahodopi and Pomalaa blocks\nowned by PT Vale Indonesia.<\/p>\n<p>\u201cFor the tin commodity from PT Timah, it shows strong growth of 63%\nto 29,100 tonnes, demonstrating the results of PT Timah\u2019s operational\nperformance improvement initiatives,\u201d he said.<\/p>\n<p>Furthermore, Maroef assessed that overall, 2026 reflects MIND ID\u2019s\nfocus on strengthening downstream processing, increasing efficiency, and\ncreating sustainable added value.<\/p>\n<p>\u201cWith this foundation, we are optimistic that MIND ID can continue to\ncontribute significantly to the national economy and create long-term\nvalue for all stakeholders,\u201d he said.<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/mind-id-targets-gold-production-increase-to-31-7-tonnes-in-2026-1776091856",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}