{
    "success": true,
    "data": {
        "id": 1233404,
        "msgid": "kl-power-firm-to-focus-on-hydro-power-1447893297",
        "date": "2002-06-17 00:00:00",
        "title": "KL power firm to focus on hydro-power",
        "author": null,
        "source": "AFP",
        "tags": null,
        "topic": null,
        "summary": "KL power firm to focus on hydro-power Malaysia's electricity utility firm Tenaga Nasional will focus on developing hydro-electric plants in efforts to ease the country's dependence on gas, reports said Sunday. Tenaga's chairman Jamaluddin Mohamad Jarjis said gas-fueled plants currently contributed to 80 percent of the country's total power consumption, while another 20 percent was from coal and hydro plants.",
        "content": "<p>KL power firm to focus on hydro-power<\/p>\n<p>Malaysia's electricity utility firm Tenaga Nasional will focus on<br>\ndeveloping hydro-electric plants in efforts to ease the country's<br>\ndependence on gas, reports said Sunday.<\/p>\n<p>Tenaga's chairman Jamaluddin Mohamad Jarjis said gas-fueled<br>\nplants currently contributed to 80 percent of the country's total<br>\npower consumption, while another 20 percent was from coal and<br>\nhydro plants.<\/p>\n<p>Jamaluddin said the development of the hydro-electric units<br>\nwould reduce the high dependence on gas, a non-renewable<br>\nresource, as well as promote a cleaner and healthier environment.<\/p>\n<p>\"Electricity generation using hydropower is much safer and<br>\nviable although the (infrastructure) cost is high, it is much<br>\ncheaper to produce when compared against that generated from gas<br>\nand coal,\" he was quoted by the official Bernama news agency as<br>\nsaying.<\/p>\n<p>Jamaluddin was speaking to reporters Saturday at the official<br>\nopening of the 1.8 billion (US$4.7 million) Sultan Ismail Petra<br>\nhydropower station in the northeastern Kelantan state.<\/p>\n<p>He said the firm was looking into similar hydro-electric<br>\nprojects nationwide to \"ensure that Malaysians receive enough<br>\nelectricity through a stable system\".<\/p>\n<p>The utility giant is currently working on a feasibility study<br>\ninto the development of a $1 billion hydro-electric project in<br>\nthe central Pahang state, which would be capable of generating<br>\n1,000 megawatts of power, he said. -- AFP<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/kl-power-firm-to-focus-on-hydro-power-1447893297",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}