{
    "success": true,
    "data": {
        "id": 1814105,
        "msgid": "kai-daop-8-guarantees-normal-train-operations-despite-surabaya-power-outage-1781959819",
        "date": "2026-06-20 18:54:00",
        "title": "KAI Daop 8 Guarantees Normal Train Operations Despite Surabaya Power Outage",
        "author": "indrastuti",
        "source": "MEDIA_INDONESIA",
        "tags": "",
        "topic": "Infrastructure",
        "summary": "PT KAI Daop 8 Surabaya has confirmed that train services and passenger operations at Surabaya Gubeng Station remain unaffected despite a power outage in the area. The station is relying on backup generators to maintain essential facilities. Passengers have been advised to remain calm and follow staff instructions during the disruption.",
        "content": "<p>PT Kereta Api Indonesia (Persero) Daerah Operasi 8 Surabaya has\nassured that train operations and passenger services at Surabaya Gubeng\nStation continue to run normally despite a power outage affecting\nseveral areas of Surabaya, including Gubeng. The outage temporarily\ncaused the station\u2019s lighting to go out, but train operations were not\nimpacted. KAI Daop 8 Surabaya confirmed that both long-distance and\nlocal train services at Surabaya Gubeng Station are still serving\nboarding and alighting passengers as usual.<\/p>\n<p>Acting Public Relations Manager of Daop 8 Surabaya, Erlangga Budi\nLaksono, stated on Saturday (20\/6) that the outage occurred due to a\ndisruption in the electricity supply from PLN in the area. \u201cHowever,\nseveral passenger service facilities continue to operate normally using\npower supplied by generators that have been prepared by Gubeng Station,\u201d\nhe said.<\/p>\n<p>KAI Daop 8 Surabaya urged passengers to remain calm during the power\nsupply disruption. The company also advised passengers to stay alert and\ncautious while carrying out activities at the station, and to always\nfollow the instructions of station officers.<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/kai-daop-8-guarantees-normal-train-operations-despite-surabaya-power-outage-1781959819",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}