{
    "success": true,
    "data": {
        "id": 1408895,
        "msgid": "japex-will-not-buy-stake-in-timor-gap-1447893297",
        "date": "1998-07-18 00:00:00",
        "title": "Japex will not buy stake in Timor Gap",
        "author": null,
        "source": "JP",
        "tags": null,
        "topic": null,
        "summary": "Japex will not buy stake in Timor Gap JAKARTA (JP): Japanese oil company Japan Petroleum Exploration Co. (Japex) had no plans to invest in the development of a depot in Timor Gap in return for a stake in the project, a company official said yesterday. The official refuted a statement by PT El Nusa president Aswad Dipo claiming that Japex had showed an interest in injecting funds into the depot project located in Kupang, East Nusatenggara, in return for a 20 percent stake.",
        "content": "<p>Japex will not buy stake in Timor Gap<\/p>\n<p>JAKARTA (JP): Japanese oil company Japan Petroleum Exploration<br>\nCo. (Japex) had no plans to invest in the development of a depot<br>\nin Timor Gap in return for a stake in the project, a company<br>\nofficial said yesterday.<\/p>\n<p>The official refuted a statement by PT El Nusa president Aswad<br>\nDipo claiming that Japex had showed an interest in injecting<br>\nfunds into the depot project located in Kupang, East<br>\nNusatenggara, in return for a 20 percent stake.<\/p>\n<p>El Nusa, a subsidiary of Indonesia's state oil company<br>\nPertamina, had shelved the US$9.1 million depot project owing to<br>\ninsufficient funds, Aswad said Thursday in a hearing with the<br>\nHouse of Representatives Commission V for mines and energy.<\/p>\n<p>According to Aswad, a group of local banks initially agreed to<br>\nfinance the project but could only supply $4.8 million due to the<br>\nmonetary crisis.<\/p>\n<p>El Nusa put the project's development on hold in April this<br>\nyear when the depot was already 80 percent complete.<\/p>\n<p>\"We heard that El Nusa's depot project was put on hold due to<br>\nfinancial difficulties, but we haven't considered financially<br>\nparticipating in the project,\" the Japex official was quoted by<br>\nDow Jones as saying in Tokyo.<\/p>\n<p>Under an exclusive negotiation right for the Savo block in the<br>\nTimor Sea awarded in May 1997 by Pertamina, Japex has been<br>\nconducting seismic explorations and reprocessing, and then<br>\nevaluating the geological data on the block.<\/p>\n<p>\"As we've done two seismic drillings so far, we are currently<br>\nreprocessing the data with a target date to complete evaluation<br>\nat the end of this year,\" he said.<\/p>\n<p>The oil and gas-rich Timor Gap, located in the Timor Sea<br>\nseparating Timor island and Australia, is co-owned by the<br>\nIndonesian and Australian governments.<\/p>\n<p>Aswad said that El Nusa's depot project in Kupang was aimed at<br>\ncompeting with oil and gas logistical depots in Darwin,<br>\nAustralia.<\/p>\n<p>Separately, another Japanese oil developer, Indonesia<br>\nPetroleum Ltd. (Inpex) has also been conducting seismic<br>\nexplorations in the Rabe block in the Timor Gap where the company<br>\nwas awarded a production-sharing contract by Pertamina.<\/p>\n<p>\"Because our (Timor) project is still in the seismic drilling<br>\nstage, we aren't yet interested in securing depot space, nor in<br>\ninvesting in the depot development project,\" an Inpex official<br>\nsaid. (jsk)<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/japex-will-not-buy-stake-in-timor-gap-1447893297",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}