{
    "success": true,
    "data": {
        "id": 1252628,
        "msgid": "its-now-or-never-1447893297",
        "date": "2002-10-26 00:00:00",
        "title": "It's now or never",
        "author": null,
        "source": "JP",
        "tags": null,
        "topic": null,
        "summary": "It's now or never Weeks after being reelected as governor of Jakarta for the second time, Sutiyoso has yet to come up with a clear plan to deal with the city's traffic and ground transportation system. For example, he does not seem to be doing anything about a specific plan to remedy the traffic chaos in the capital city, but about the continuation of the construction of the 52- kilometer segment of the uncompleted Jakarta Outer Ring Road project, which was halted due to the economic crisis.",
        "content": "<p>It's now or never<\/p>\n<p>Weeks after being reelected as governor of Jakarta for the<br>\nsecond time, Sutiyoso has yet to come up with a clear plan to<br>\ndeal with the city's traffic and ground transportation system.<\/p>\n<p>For example, he does not seem to be doing anything about a<br>\nspecific plan to remedy the traffic chaos in the capital city,<br>\nbut about the continuation of the construction of the 52-<br>\nkilometer segment of the uncompleted Jakarta Outer Ring Road<br>\nproject, which was halted due to the economic crisis. However, as<br>\nmany observers have suggested, constructing new toll roads is a<br>\nshort-term solution that will not cure the city's perennial<br>\ntransportation illness.<\/p>\n<p>Transportation expert Djamester Simarmata, for instance,<br>\nbelieves that the construction of new toll roads would only<br>\nencourage people to buy their own cars, rather than use public<br>\ntransportation, one obvious reason being that public transport is<br>\nconsidered unsafe and uncomfortable.<\/p>\n<p>Unfortunately, the city administration has failed to formulate<br>\na grand plan to respond to the traffic problems despite its<br>\nawareness that an integrated transportation system is needed.<\/p>\n<p>At the end of the 1980s the paradigm of city development<br>\nchanged and the Jakarta administration started talking about<br>\ndeveloping the city along its east-west axis instead of north-<br>\nsouth, as had been the case up to that point. Unfortunately, the<br>\nroad and transportation system was never properly developed to<br>\nmatch the growth of residential neighborhoods and office<br>\nbuildings.<\/p>\n<p>In the late 1980s, a former official at the Ministry of Public<br>\nWorks who was working for a company owned by President Soeharto's<br>\ndaughter Siti Hardijanti Rukmana, introduced a plan for an<br>\noverhead monorail commuter train service, called an \"aeromovel\"<br>\nsystem, utilizing Brazilian technology.<\/p>\n<p>With 34 terminals at certain locations, the train would have<br>\nbeen able to carry about 15,000 passengers per hour. Supported by<br>\nanother mode of transportation on the feeder lines, the aeromovel<br>\nwould ply the Blok M-Kota (south-west and south-north) route.<\/p>\n<p>The aeromovel integrated system was expected to answer the<br>\nneed for a mass rapid transit system for Jakarta at that time.<\/p>\n<p>However, the Agency for the Assessment and Application of<br>\nTechnology (BPPT), which at that time was chaired by B.J.<br>\nHabibie, did not seem to approve of the plan, which it deemed<br>\nill-suited for Jakarta.<\/p>\n<p>Later, in the early 1990s an O-Bahn Rail Bus system, to be<br>\nbuilt with German technology, was offered to solve the city<br>\ntransportation chaos. The O-Bahn would also serve the Blok M-Kota<br>\nroute. With a 30 second interval between departures, the bus<br>\nwould be capable of carrying about 10,800 passengers per hour.<\/p>\n<p>The city administration looked interested in the O-Bahn bus<br>\nsystem, which is also used in Essen, Germany and in Adelaide,<br>\nAustralia. Despite these two promising offers, the city<br>\nadministration and the Ministry of Transportation have used<br>\nneither of them even as traffic has grown more and more chaotic<br>\nby the day.<\/p>\n<p>As things stand at present, Jakarta's traffic system is<br>\ndeteriorating. Constant traffic congestions, which inflict some<br>\nRp 2.67 billion in daily losses for motorists, continue to occur.<br>\nObviously, such a situation cannot be allowed to remain<br>\nuncorrected. And the figures do not include losses suffered by<br>\nthose who are forced to be late to their offices due to the<br>\ncongestion.<\/p>\n<p>Jakarta, at present, has 6,500 kilometers of road to<br>\naccommodate some four million cars and motorbikes. While the<br>\nnumber of vehicles increases from day to day, the length of the<br>\ncity roads apparently remains stagnant. The result is that the<br>\ncity's roads, including the urban toll roads, can no longer<br>\naccommodate the number of vehicles.<\/p>\n<p>Jakarta's urban toll roads, which are designed to accommodate<br>\nonly 65,000 cars a day, are now used by at least 200,000 cars per<br>\nday. Building new artery roads seems impossible. There is no more<br>\nopen space left in Jakarta, which is already overcrowded with<br>\naround 12 million daytime residents. The city administration must<br>\nrevive its plan to establish an integrated transportation plan<br>\nwhich involves a mass rapid transit system (MRT), using the most<br>\nsuitable and affordable technology.<\/p>\n<p>It is now or never. It is no exaggeration to say that the<br>\ncurrent uncertain security situation combined with the constant<br>\ntraffic congestions are not only a headache for Jakarta's<br>\nresidents, but are also a factor that could deter prospective<br>\ninvestors from planting their money in this city.<\/p>\n<p>If the city administration fails to establish an appropriate<br>\nintegrated transportation system for Jakarta, we will surely face<br>\nmore serious problems in the future. In the next one or two<br>\ndecades the situation could become even more complicated with the<br>\nnumber of vehicles increasing at an uncontrollable rate.<\/p>\n<p>Ofyar Z. Tamin, a Bandung-based transportation expert,<br>\nsuggested that the existing railway system must also be improved<br>\nand made into a part of the integrated transportation system.<\/p>\n<p>While selecting the best technology to be used for the MRT<br>\nsystem and seeking financial sources to fund the project, the<br>\ncity administration must do everything it can to solve traffic<br>\nproblems by clearing vendors and illegal parking areas from the<br>\ncity streets.<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/its-now-or-never-1447893297",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}