{
    "success": true,
    "data": {
        "id": 1645911,
        "msgid": "how-many-merah-putih-village-cooperatives-have-been-built-100-zulhas-speaks-1774943683",
        "date": "2026-03-31 13:45:00",
        "title": "How Many Merah Putih Village Cooperatives Have Been Built 100%? Zulhas Speaks",
        "author": "",
        "source": "CNBC",
        "tags": "",
        "topic": "Social Policy",
        "summary": "Coordinating Minister for Food Affairs Zulkifli Hasan reported that 3,505 Merah Putih Village Cooperatives (KDMP) have been fully constructed across Indonesia's 83,764 villages, with 25,121 sites still under construction as of late March 2026. He noted that 33,168 sites are ready for development, with hopes to reach 40,000 by June 2026, after which a re-evaluation will assess land constraints in urban areas where plots are smaller than the required 1,000 square metres. For limited land, vertical building models will be adopted to ensure progress in establishing these cooperatives, which aim to bolster rural economic initiatives.",
        "content": "<p>Jakarta - Coordinating Minister for Food Affairs Zulkifli Hasan\n(Zulhas) has revealed the progress of physical construction of Merah\nPutih Village Cooperatives (KDMP) up to the end of March 2026. Zulhas\nstated that 3,505 KDMP have been fully built in 83,764 villages across\nIndonesia, while 25,121 sites are still under construction. \u201cWe report\nthat there are already 3,505 sites that are 100% complete in building\nthe village cooperatives, while 25,121 sites are still in the process of\nbeing built; we hope this continues to increase,\u201d said Zulhas during a\npress conference after the limited coordination meeting on KDMP\ndevelopment, on Tuesday (31\/3\/2026). Additionally, Zulhas explained that\nthe number of sites ready for KDMP construction is steadily increasing,\nwith 33,168 sites now prepared. He hopes that the number of ready sites\nwill continue to grow. \u201cWell, the ready land is increasing continuously.\nNow it\u2019s 33,168 sites; hopefully by June 2026, the ready land can reach\n40,000,\u201d he continued. Once the number of ready sites reaches 40,000,\nhis side will conduct an evaluation and re-data collection. This is\nbecause some villages or urban wards do not have land as large as 1,000\nsquare metres. \u201cAfter reaching 40,000, we will re-data everything.\nBecause there are also places where the land is not up to 1,000 square\nmetres, for example in urban wards, in big cities the land is not up to\n1,000 square metres, some are 500 square metres to 700 square metres,\u201d\nhe explained. For KDMP sites with limited land, they will build using a\nvertical model. \u201cIf the land is less than 1,000 square metres, then we\nwill build the model, perhaps going upwards or something like that,\u201d he\nsaid.<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/how-many-merah-putih-village-cooperatives-have-been-built-100-zulhas-speaks-1774943683",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}