{
    "success": true,
    "data": {
        "id": 1450300,
        "msgid": "government-claims-power-shortage-has-subsided-1447893297",
        "date": "2004-11-24 00:00:00",
        "title": "Government claims power shortage has subsided",
        "author": null,
        "source": "JP",
        "tags": null,
        "topic": null,
        "summary": "Government claims power shortage has subsided Leony Aurora, The Jakarta Post, Jakarta The number of areas across the country suffering a power shortage has declined by more than 50 percent, or less than 10 regions, a top energy ministry official has said. Ministry of Energy and Mineral Resources Secretary-General Luluk Sumiarso, speaking on Tuesday on the sidelines of the National Energy Congress, said more than 20 areas had previously been battling a shortage of electricity.",
        "content": "<p>Government claims power shortage has subsided<\/p>\n<p>Leony Aurora, The Jakarta Post, Jakarta<\/p>\n<p>The number of areas across the country suffering a power shortage<br>\nhas declined by more than 50 percent, or less than 10 regions, a<br>\ntop energy ministry official has said.<\/p>\n<p>Ministry of Energy and Mineral Resources Secretary-General<br>\nLuluk Sumiarso, speaking on Tuesday on the sidelines of the<br>\nNational Energy Congress, said more than 20 areas had previously<br>\nbeen battling a shortage of electricity.<\/p>\n<p>One measure taken by state power firm PT PLN to solve the<br>\npower shortage was to develop a transmission network linking<br>\nSouth Sumatra and West Sumatra.<\/p>\n<p>\"We have substantial water potential in West Sumatra (to move<br>\npower plants' turbines),\" said Luluk. \"When water is abundant,<br>\nelectricity can be transmitted to the southern areas (of<br>\nSumatra).\"<\/p>\n<p>Several areas suffered power shortages a few months ago, when<br>\nthe water level in reservoirs used by hydropower stations dropped<br>\nduring the dry season.<\/p>\n<p>West Sumatra, Riau and Jambi were among the provinces that<br>\nexperienced long and frequent power cuts, which were carried out<br>\non a rotation system by PLN branches to conserve the local power<br>\nsupply. The provinces lost power for three to six hours a day,<br>\nand sometimes for six to 10 hours a day.<\/p>\n<p>Power has become an increasingly serious issue over the past<br>\nfew years, as demand continues to grow but supply remains<br>\nstagnant due to a lack of investment.<\/p>\n<p>PLN has said it would need some US$5 billion in new investment<br>\nfor the 2002-2006 period and $28.5 billion over the next 10<br>\nyears.<\/p>\n<p>Chairman of the Indonesian National Committee of World Energy<br>\nCouncil Hardiv Situmeang reiterated the urgency for the<br>\ngovernment to promote the use of renewable energy.<\/p>\n<p>\"Studies have proved that in the long term, (power) plants<br>\nusing renewable energy are more sustainable (than those using<br>\nfossil fuel),\" Hardiv told reporters.<\/p>\n<p>To make renewable energy projects more attractive, investor<br>\nincentives, such as eligibility to engage in emission trading<br>\nunder the Kyoto Protocol, should be provided, he said.<\/p>\n<p>The protocol, which will come into effect early next year,<br>\ncommits 55 industrialized nations to making significant cuts in<br>\nthe emission of greenhouse gases by 2012.<\/p>\n<p>One means of fulfilling the protocol is to provide funds for<br>\nsustainable projects in countries that do not have emission<br>\nreduction targets.<\/p>\n<p>\"The government needs to speed up the establishment of a<br>\nnational body to offer such projects to industrialized<br>\ncountries,\" said Hardiv. \"Otherwise, other better-prepared<br>\ncountries like Vietnam, Malaysia and India will outrun us.\"<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/government-claims-power-shortage-has-subsided-1447893297",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}