{
    "success": true,
    "data": {
        "id": 1395375,
        "msgid": "gas-for-duri-steamflood-1447893297",
        "date": "1998-10-06 00:00:00",
        "title": "Gas for Duri steamflood",
        "author": null,
        "source": "DJ",
        "tags": null,
        "topic": null,
        "summary": "Gas for Duri steamflood DENVER (Dow Jones): Gulf Indonesia Resources Ltd. (GRL), Talisman (Corridor) Ltd. and Pertamina (Indonesia) said gas deliveries have begun at the Corridor Gas Project to the Duri steamflood project in central Sumatra. In a news release, Gulf Indonesia said natural gas is being delivered through a 544-kilometer, or about 340-mile, pipeline constructed and operated by PT Perusahaan Gas Negara, the Indonesian state gas distribution\/transmission company.",
        "content": "<p>Gas for Duri steamflood<\/p>\n<p>DENVER (Dow Jones): Gulf Indonesia Resources Ltd. (GRL),<br>\nTalisman (Corridor) Ltd. and Pertamina (Indonesia) said gas<br>\ndeliveries have begun at the Corridor Gas Project to the Duri<br>\nsteamflood project in central Sumatra.<\/p>\n<p>In a news release, Gulf Indonesia said natural gas is being<br>\ndelivered through a 544-kilometer, or about 340-mile, pipeline<br>\nconstructed and operated by PT Perusahaan Gas Negara, the<br>\nIndonesian state gas distribution\/transmission company.<\/p>\n<p>The Duri project is operated by PT Caltex Pacific Indonesia.<\/p>\n<p>Gulf Indonesia said that by the end of the year, the Corridor<br>\nGas Project should produce about 300 million cubic feet a day of<br>\nsales gas, displacing about 48,000 barrels a day of crude oil<br>\ncurrently being used to generate steam at Duri, the largest<br>\nsteamflood project in the world.<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/gas-for-duri-steamflood-1447893297",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}