{
    "success": true,
    "data": {
        "id": 1654099,
        "msgid": "ensure-sufficient-balance-details-of-tolls-for-3-ramp-junctions-in-palembang-1775213449",
        "date": "2026-04-03 17:00:00",
        "title": "Ensure Sufficient Balance: Details of Tolls for 3 Ramp Junctions in Palembang",
        "author": "Hilda B Alexander",
        "source": "KOMPAS",
        "tags": "",
        "topic": "Infrastructure",
        "summary": "PT Hutama Karya has urged road users to ensure their electronic money balances are sufficient ahead of the integrated toll implementation at Junction Palembang, operational from Friday, 3 April 2026. This follows the opening of three new ramps\u2014Ramp 5 (Betung\u2013Indralaya), Ramp 6 (Betung\u2013Palembang), and Ramp 8 (Palembang\u2013Kayu Agung)\u2014enabling more efficient travel without exiting the toll road, as per Ministerial Decree Number 167\/KPTS\/M\/2026. The integration enhances connectivity in the Palembang region, with tolls charged based on the route taken, and further ramps to open alongside the Palembang\u2013Betung toll.",
        "content": "<p>JAKARTA, KOMPAS.com - PT Hutama Karya (Persero) is urging road users\nto ensure their electronic money balances are sufficient with the\nimplementation of integrated tariffs at Junction Palembang, which begins\noperations on Friday (3\/4\/2026). This policy applies following the\nopening of three new ramps that support more practical journeys without\nexiting the toll road. The operation of Junction Palembang refers to\nMinisterial Decree (SK) of Public Works (PU) Number 167\/KPTS\/M\/2026.\nThis includes Ramp 5 (Betung\u2013Indralaya), Ramp 6 (Betung\u2013Palembang), and\nRamp 8 (Palembang\u2013Kayu Agung). With this integration, road users will be\ncharged tariffs according to the route travelled. Meanwhile, Ramp 4A\n(Indralaya\u2013Betung) as well as Ramp 7 (Betung\u2013Kramasan and Kramasan\u2013Kayu\nAgung) will open simultaneously with the operation of the\nPalembang\u2013Betung Toll Road. Acting Executive Vice President (EVP)\nSecretary of Hutama Karya, Hamdani, reminded of the importance of\npreparation before travelling on that toll section. According to him,\nwith the operation of Junction Palembang, connectivity between toll\nsections in the Palembang and surrounding areas will be even better.\nThus, road users can now undertake several journeys more efficiently and\npractically through directly connected routes. \u201cWe urge road users to\nprepare their journeys well, including checking routes and ensuring\nsufficient electronic money balances before passing through,\u201d he said on\nThursday (2\/4\/2026). Ramp 5 (Kramasan to Pemulutan, KTM Rambutan,\nIndralaya, to Prabumulih): Kramasan\u2013Pemulutan Group I: Rp 9,000\nKramasan\u2013KTM Rambutan<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/ensure-sufficient-balance-details-of-tolls-for-3-ramp-junctions-in-palembang-1775213449",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}