{
    "success": true,
    "data": {
        "id": 1219714,
        "msgid": "design-for-subway-in-the-work-1447893297",
        "date": "1995-07-22 00:00:00",
        "title": "Design for subway in the work",
        "author": null,
        "source": "JP",
        "tags": null,
        "topic": null,
        "summary": "Design for subway in the work JAKARTA (JP): The government has chosen an Indonesian-Japanese-European consortium to prepare a basic design for the construction of country's first subway system connecting Blok M in South Jakarta and Kota in West Jakarta. A memorandum of understanding on the basic design will be signed here in the near future, Governor Surjadi Soedirdja told reporters yesterday.",
        "content": "<p>Design for subway in the work<\/p>\n<p>JAKARTA (JP): The government has chosen an<br>\nIndonesian-Japanese-European consortium to prepare a basic design<br>\nfor the construction of country's first subway system connecting<br>\nBlok M in South Jakarta and Kota in West Jakarta.<\/p>\n<p>A memorandum of understanding on the basic design will be<br>\nsigned here in the near future, Governor Surjadi Soedirdja told<br>\nreporters yesterday.<\/p>\n<p>In order to finance the project, he said the government has<br>\ncombined local and foreign investors to participate in making the<br>\nsubway's basic design.<\/p>\n<p>\"The consortium is called IJEG or the Indonesian-Japan-<br>\nEuropean group,\" Surjadi said but refused to give further details<br>\non the date of the MOU signing.<\/p>\n<p>He said that the companies in the consortium are expected to<br>\nnegotiate among themselves their contributions to the basic<br>\ndesign costs before the signing.<\/p>\n<p>The Bisnis Indonesia daily reported earlier that the<br>\nconsortium consists of Itochu Corp (Japan), Ferrostaal AG, AEG,<br>\nSiemens (Germany), Asea Brown Bovery Ltd. (Sweden-Switzerland),<br>\nTaylor Woodrow Plc. (England) and several local partners,<br>\nincluding Citra Lamtorogung, Bakrie Brothers, Lippo, Bukaka,<br>\nSuhamthabie and Steady Safe.<\/p>\n<p>The governor, who is also the chairman of the project<br>\nmanagement unit, said that the consortium will not automatically<br>\nwin the contract to build the subway system.<\/p>\n<p>\"After the consortium produces the basic design, there will be<br>\na tender to determine the company in charge of constructing the<br>\nproject,\" he said.<\/p>\n<p>Governor Surjadi's statement corrects the remarks made<br>\nrecently by Minister of Transportation Haryanto Dhanutirto that<br>\nthe government would shun a tender process and directly choose<br>\nthe partners to build the subway project.<\/p>\n<p>The subway's basic design will cost about US$8 million while<br>\nthe total cost of the 14-kilometer subway project has been<br>\nestimated at a cost of US$1.3 billion.<\/p>\n<p>\"The basic design is expected to be finished next year,\" the<br>\ngovernor said.<\/p>\n<p>Surjadi said that his project management unit is still hard at<br>\nwork calculating the project costs.<\/p>\n<p>\"Calculating the cost is very difficult because we have to<br>\npredict how much should be invested in every kilometer,\" he said.<br>\n(yns)<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/design-for-subway-in-the-work-1447893297",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}