{
    "success": true,
    "data": {
        "id": 1669145,
        "msgid": "danantara-assures-support-for-psel-development-project-in-jambi-city-1775807453",
        "date": "2026-04-10 14:19:30",
        "title": "Danantara assures support for PSEL development project in Jambi City",
        "author": "",
        "source": "ANTARA_ID",
        "tags": "",
        "topic": "Infrastructure",
        "summary": "The Danantara investment management agency has pledged its support for the construction of a Waste-to-Energy (PSEL) facility in Jambi City, with the project slated for tender in April to May 2026 and groundbreaking in the same year. The initiative, prioritised nationally, aims to process 1,000 tonnes of waste daily to generate electricity and includes supporting facilities like ash processing plants and green zones, addressing the city's current waste supply shortfall of around 450 tonnes per day through regional cooperation. This project follows President Prabowo Subianto's directives to tackle waste emergencies and produce renewable energy.",
        "content": "<p>The Danantara investment management agency has assured support for\nthe construction of a Waste-to-Energy (PSEL) facility in Jambi City.\n\u201cThis project is targeted to enter the tender stage soon in April to May\n2026, followed by the groundbreaking in the same year,\u201d said Danantara\u2019s\nDirector of Project and Stakeholder Management, Maulana Muhammad, in\nJambi on Friday. According to him, the Jambi City Government has\ndemonstrated good preparedness, particularly in providing land in the\nTalang Gulo Final Disposal Site (TPA) area, with more than five hectares\navailable suitable for the main facility construction. \u201cThis PSEL\nproject will be developed as a large-scale waste-to-energy facility with\na processing capacity of around 1,000 tonnes of waste per day, which not\nonly generates electricity but is also equipped with supporting\nfacilities such as a Fly Ash and Bottom Ash (FABA) plant and a green\nzone as part of environmental management,\u201d said Maulana. He stated that\nJambi City has been included in the category of national priority areas,\nmaking the acceleration of development a primary focus, and Danantara is\ncommitted to overseeing the project\u2019s realisation to ensure it proceeds\naccording to targets, with operations at the latest in 2028. The Jambi\nCity Government has prepared 21 hectares of land support in the Talang\nGulo TPA area, he said, but still faces challenges in meeting the raw\nmaterial waste supply, which currently only reaches around 450 tonnes\nper day. \u201cWe hope this project can become a long-term solution for waste\nmanagement while producing environmentally friendly electricity for the\ncommunity, thus requiring cooperation with surrounding areas to ensure\nwaste supply availability for PSEL operations,\u201d he said. Meanwhile,\nJambi Mayor Maulana continues to refine the preparedness of the Talang\nGulo TPA as the location for PSEL or waste-to-energy (WtE) development,\naimed at addressing the waste emergency issues at the TPA while\ngenerating renewable energy, as a follow-up to President Prabowo\nSubianto\u2019s directives.<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/danantara-assures-support-for-psel-development-project-in-jambi-city-1775807453",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}