{
    "success": true,
    "data": {
        "id": 1390617,
        "msgid": "controversial-timber-estate-ready-for-harvest-1447893297",
        "date": "1998-03-04 00:00:00",
        "title": "Controversial timber estate ready for harvest",
        "author": null,
        "source": "JP",
        "tags": null,
        "topic": null,
        "summary": "Controversial timber estate ready for harvest By Sylvia Gratia M. Nirang SUBANJERIJI, South Sumatra (JP): After facing sharp criticism from environmental bodies since the early stages of its inception, PT Musi Hutan Persada (MHP) is now ready to harvest part of its 193,500-hectare timber estate. Company general manager H.",
        "content": "<p>Controversial timber estate ready for harvest<\/p>\n<p>By Sylvia Gratia M. Nirang<\/p>\n<p>SUBANJERIJI, South Sumatra (JP): After facing sharp criticism<br>\nfrom environmental bodies since the early stages of its<br>\ninception, PT Musi Hutan Persada (MHP) is now ready to harvest<br>\npart of its 193,500-hectare timber estate.<\/p>\n<p>Company general manager H. Agusnang said MHP would harvest 2.5<br>\nmillion cubic meters of wood from 10,000 hectares of its estate<br>\nin the middle of this year to supply a new plant owned by PT<br>\nTanjung Enim Lestari Pulp and Paper.<\/p>\n<p>He said the US$1 billion pulp plant, scheduled to start<br>\noperations in Aug. 1999, would need 2.5 million cubic meters of<br>\nwood for an initial production capacity of 450,000 tons of pulp<br>\nper year.<\/p>\n<p>\"This year, we will harvest about 10,000 hectares of our<br>\nAcacia mangium trees to supply the pulp plant,\" Agusnang said.<\/p>\n<p>The timber estate and the pulp plant are subsidiaries of<br>\nBarito Pacific Timber, a giant timber company controlled by<br>\ntimber tycoon Prajogo Pangestu.<\/p>\n<p>Barito Pacific owns 60 percent of MHP's shares, while 40<br>\npercent is controlled by state-owned timber estate PT Inhutani V.<\/p>\n<p>The government has granted the company a 296,400-hectare<br>\nconcession area for its timber estate in South Sumatra, but it is<br>\nonly able to develop 193,500 hectares, as the remaining land is<br>\neither owned by local residents or is designated as a<br>\nconservation area.<\/p>\n<p>Barito Pacific holds 51 percent of PT Tanjung Enim's shares,<br>\nwhile Sumatra Pulp Corporation controls 33 percent and PT Tridan<br>\nSatriaputra Indonesia owns the remaining 16 percent.<\/p>\n<p>PT Tridan Satriaputra is controlled by President Soeharto's<br>\neldest daughter Siti Hardiyanti Rukmana, while Sumatra Pulp<br>\nCorporation is a joint venture of Marubeni Corporation, Nippon<br>\nPaper Industries and Japan's Overseas Economic Corporation Fund.<\/p>\n<p>Agusnang said MHP had planted Acacia mangium trees on 160,000<br>\nhectares of its estate. The tree has been a raw material for the<br>\ncompany's pulp since the start of its plantation activities in<br>\n1990.<\/p>\n<p>He explained that after its initial production needs of 2.5<br>\nmillion cubic meters of Acacia mangium wood in its first year,<br>\nthe pulp plant would require 4.5 million cubic meters of raw<br>\nmaterial to meet a targeted production capacity of one million<br>\ntons of pulp per year starting in its second year.<\/p>\n<p>MHP will supply the raw material for the plant's second year<br>\nof production from 25,000 hectares of its timber estate.<\/p>\n<p>Agusnang said the pulp plant was originally scheduled to begin<br>\noperations in mid-1998 and that the delay has forced MHP to<br>\nreview its operational plans.<\/p>\n<p>\"We have sold premier seeds produced by our nursery in<br>\nSubanjeriji to other timber estates just to keep our cash flow<br>\nmoving. We also sell furniture wood such as sengon and sungkai,\"<br>\nhe said adding that the company has sold 500 tons of premier<br>\nseeds of trees per year since 1994 at an average price of Rp<br>\n350,000 per kilogram.<\/p>\n<p>He said the delay in the plant's operation was mostly due to<br>\ncriticism from environmental analysts on the development of the<br>\npulp plant and the timber estates.<\/p>\n<p>The Indonesian Forum for Environment (Walhi), for example, has<br>\nsaid the development of Tanjung Enim Lestari's plant would cause<br>\n\"massive social problems\".<\/p>\n<p>The company has \"seized the people's forests and farmland<br>\nwithout any prior consultation,\" said Walhi, a prominent non-<br>\ngovernmental organization.<\/p>\n<p>The pulp and paper mill, according to Walhi, will also benefit<br>\nfrom conservation forests in the area, thereby endangering forest<br>\nsustainability.<\/p>\n<p>The plant straddles two subdistricts, Gunung Megang and<br>\nRambang Dangku in Muara Enim regency, about 130 kilometers west<br>\nof South Sumatra's capital of Palembang.<\/p>\n<p>MHP's timber estate is 25 kilometers south of the pulp plant<br>\nand is in the regencies of Ogan Komering Ulu (OKU), Muara Enim,<br>\nMusi Banyuasin, Lahat and Musi Rawas.<\/p>\n<p>The company divides its concession into three sections. The<br>\nfirst, Martapura, covers 10,350 hectares of forest in OKU<br>\nregency. The second, Subanjeriji, covers 87,354 hectares of<br>\nforest in Muara Enim, while Benakat, the third, covers 198,741<br>\nhectares of forests in Lahat, Musi Banyuasin and Musi Rawas<br>\nregencies.<\/p>\n<p>Walhi also has said it has discovered that MHP, in order to<br>\nestablish its timber estate, appropriated its land from local<br>\npeople at extremely low prices.<\/p>\n<p>According to Walhi's site surveys in 1995, MHP designated<br>\nextremely low-density forest areas for its conservation sites<br>\nwhile selecting high-density forest areas for its timber<br>\noperations.<\/p>\n<p>Agusnang said there was no problem because MHP only used<br>\n193,500 hectares of its 296,400-hectare concession for timber<br>\ndevelopment.<\/p>\n<p>The company also maintains 86,450 hectares of lowland tropical<br>\nforest in its concession as a conservation area while the rest of<br>\nits concession is jointly managed with local villagers, who plant<br>\nrubber trees and seasonal crops, he said.<\/p>\n<p>\"All the problems have been carefully taken care of, but it is<br>\nimpossible to satisfy everyone,\" Agusnang said.<\/p>\n<p>He said MHP also planned to build a chip wood mill and a<br>\nmedium density fiberboard (MDF) plant because MDF was deemed to<br>\nbe a growing industry.<\/p>\n<p>He said the MDF plant would be built solely by his company and<br>\nit was expected to produce 240,000 tons of MDF per year.<\/p>\n<p>The raw material for the MDF plant is to come from surplus<br>\nsupplies designated to Tanjung Enim's pulp plant.<\/p>\n<p>He said the prospects for the MDF industry were good because<br>\nmarket demand was increasing and raw materials in the country<br>\nwere abundant.<\/p>\n<p>He also said MHP was ready to join the ecolabeling assessment<br>\nprocess conducted by the Indonesia Ecolabeling Foundation this<br>\nyear in anticipation of the global trade era.<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/controversial-timber-estate-ready-for-harvest-1447893297",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}