{
    "success": true,
    "data": {
        "id": 1275477,
        "msgid": "caltex-resumes-operations-at-three-burned-oil-wells-1447893297",
        "date": "2000-11-16 00:00:00",
        "title": "Caltex resumes operations at three burned oil wells",
        "author": null,
        "source": "DJ",
        "tags": null,
        "topic": null,
        "summary": "Caltex resumes operations at three burned oil wells SINGAPORE (Dow Jones): PT Caltex Pacific Indonesia has restarted pumping operations at three of the four oil wells knocked off line Nov. 6 in Riau province by fires set by local protesters, Robert Galbraith, senior vice president of CPI's Sumatra operations, told Dow Jones Newswires on Wednesday.",
        "content": "<p>Caltex resumes operations at three burned oil wells<\/p>\n<p>SINGAPORE (Dow Jones): PT Caltex Pacific Indonesia has<br>\nrestarted pumping operations at three of the four oil wells<br>\nknocked off line Nov. 6 in Riau province by fires set by local<br>\nprotesters, Robert Galbraith, senior vice president of CPI&apos;s<br>\nSumatra operations, told Dow Jones Newswires  on Wednesday.<\/p>\n<p>The four wells in the Batang oil field together produced about<br>\n300 barrels a day of crude, although initial estimates of the<br>\nproduction loss were in a range of 500-1,000 barrels a day.<\/p>\n<p>Galbraith said three of the four wells have started pumping<br>\nagain. The fourth well accounts for 75-125 b\/d.<\/p>\n<p>The fourth well should be back online &quot;in the next day or so,&quot;<br>\nhe said.<\/p>\n<p>The cost of the damage to the wells is about US$210,000, while<br>\nthe estimated cost of lost production has been estimated at<br>\n$50,000.<\/p>\n<p>The fires were set by a farmers&apos; group upset about the level<br>\nof compensation for CPI&apos;s use of the land.<\/p>\n<p>CPI&apos;s managing director Gary Fitzgerald said last week that<br>\nthe owners of the land have been compensated, but that users of<br>\nthe land were demanding the same level of compensation.<\/p>\n<p>Part of the compensation to the landowners was to be passed on<br>\nto the users of the land, he said, and the conflict is actually<br>\nbetween the owners and the users of the land.<\/p>\n<p>CPI is caught in the middle, he said.<\/p>\n<p>Galbraith said CPI&apos;s operations continue to be disrupted on a<br>\ndaily basis by &quot;sporadic blockades,&quot; which have cost CPI about<br>\n30,000 b\/d in lost production this year.<\/p>\n<p>CPI&apos;s current production stands at about 695,000 b\/d, he said.<\/p>\n<p>CPI has been the target of recurring protests at its Riau<br>\noperations since April, with local groups seeking employment or<br>\nbetter job benefits.<\/p>\n<p>CPI is a joint venture of Chevron Corp. and Texaco Inc.<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/caltex-resumes-operations-at-three-burned-oil-wells-1447893297",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}