{
    "success": true,
    "data": {
        "id": 1662008,
        "msgid": "bts-electric-bus-route-bojonggede-sentul-requires-rp12-billion-annually-1775602314",
        "date": "2026-04-07 20:19:35",
        "title": "BTS Electric Bus Route Bojonggede-Sentul Requires Rp12 Billion Annually",
        "author": "",
        "source": "ANTARA_ID",
        "tags": "",
        "topic": "Infrastructure",
        "summary": "The Bogor Regency Government estimates an annual budget of Rp12 billion for implementing the Buy The Service (BTS) scheme for electric buses on the Bojonggede-Sentul route, covering operational costs without initial capital outlay for fleet acquisition or driver salaries. The calculation is based on nine buses covering 300 km daily each, with per-kilometre costs of Rp10,000 to Rp12,000, assuming free service fully subsidised by the government. Introducing fares could offset up to Rp9 billion yearly, reducing the subsidy burden, while trials aim to integrate the service with existing transport without disrupting local operators and encourage shifts to public transport.",
        "content": "<p>The Bogor Regency Government in West Java estimates a budget\nrequirement of around Rp12 billion per year for implementing the Buy The\nService (BTS) scheme for electric buses on the Bojonggede-Sentul\nroute.<\/p>\n<p>The Head of the Bogor Regency Transportation Agency, Bayu Ramawanto,\nin Cibinong on Tuesday, stated that the estimate is calculated based on\nthe fleet\u2019s mileage, daily trips, and operational costs per\nkilometre.<\/p>\n<p>\u201cFor the time being, we calculate the electric bus at around Rp10,000\nto Rp12,000 per kilometre. If it can cover 300 kilometres a day, just\nmultiply it out,\u201d said Bayu.<\/p>\n<p>He explained that the Bojonggede-Sentul route is about 50 kilometres\nlong. Assuming one fleet covers six trips per day, the total mileage\nreaches around 300 kilometres per day.<\/p>\n<p>Under this scheme, operational costs are calculated by multiplying\nthe per-kilometre rate by the total daily mileage and the number of\noperating days in a month.<\/p>\n<p>The Bogor Regency Transportation Agency also estimates the need for\nnine bus units to serve this corridor, projecting a total annual budget\nof around Rp12 billion.<\/p>\n<p>Bayu stated that the BTS scheme has advantages because the government\ndoes not need to spend initial capital on fleet procurement or other\noperational costs such as driver salaries.<\/p>\n<p>\u201cThe benefit is we don\u2019t need to buy buses or pay drivers. We just\npay for the service,\u201d he said.<\/p>\n<p>He added that the calculation still assumes free service for the\npublic, so all costs are borne by the government through subsidies.<\/p>\n<p>However, if fares are implemented in the future, part of the\noperational costs could be covered by service revenue.<\/p>\n<p>\u201cIf one bus can generate Rp100 million per month, that means Rp1.2\nbillion per year. For nine buses, it could be around Rp9 billion. That\ncould reduce the subsidy burden,\u201d said Bayu.<\/p>\n<p>Previously, the Bogor Regency Government through the Transportation\nAgency was trialling the Bojonggede-Sentul route as an initial step to\nstudy the implementation of the BTS scheme for mass transportation.<\/p>\n<p>The trial is conducted to gauge public response, service\neffectiveness, and potential integration with existing transport hubs in\nthe corridor.<\/p>\n<p>In addition, the Transportation Agency is considering that the\ndevelopment of the new route does not conflict with existing transport,\nsuch as city minibuses.<\/p>\n<p>\u201cThat\u2019s why we trial it first, so it doesn\u2019t overlap too much with\nthe existing minibus routes,\u201d said Bayu.<\/p>\n<p>According to him, developing mass transportation through the BTS\nscheme is expected to encourage the public to switch from private\nvehicles to more integrated and organised public transport.<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/bts-electric-bus-route-bojonggede-sentul-requires-rp12-billion-annually-1775602314",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}