{
    "success": true,
    "data": {
        "id": 1331347,
        "msgid": "bogor-botanical-gardens-underpass-already-under-construction-1447899208",
        "date": "2003-12-15 00:00:00",
        "title": "Bogor Botanical Gardens underpass already under construction ",
        "author": null,
        "source": "JP",
        "tags": null,
        "topic": null,
        "summary": "Bogor Botanical Gardens underpass already under construction Leony Aurora The Jakarta Post Jakarta The construction of a pedestrian underpass connecting Bogor Institute of Agriculture (IPB) with the Bogor Botanical Gardens, is already underway. A new parking lot at the insitute and a new gate at the botanical gardens are being built as part of the project. Due to a huge hole on Jl. Pajajaran, Bogor marking the site of the underpass, traffic is being diverted to another road.",
        "content": "<p>Bogor Botanical Gardens underpass already under construction<\/p>\n<p>Leony Aurora <br>\nThe Jakarta Post<br>\nJakarta<\/p>\n<p>The construction of a pedestrian underpass connecting Bogor <br>\nInstitute of Agriculture (IPB) with the Bogor Botanical Gardens, <br>\nis already underway. A new parking lot at the insitute and a new <br>\ngate at the botanical gardens are being built as part of the <br>\nproject.<\/p>\n<p>Due to a huge hole on Jl. Pajajaran, Bogor marking the site of <br>\nthe underpass, traffic is being diverted to another road.<\/p>\n<p>ITB students have protested that the Rp 7.6 billion <br>\n(US$894,117) project, called the integrated rearrangement of <br>\nBaranangsiang area, will change the face of their campus. But <br>\ngrass has already been cleared for the parking lot and concrete <br>\nlaid.<\/p>\n<p>The parking lot, with a capacity of 50 buses, will be located  <br>\nnear the basketball court. Visitors will have to walk 200 meters <br>\nthrough the campus grounds to access the underpass. The street in <br>\nfront of the parking lot will also be widened to enable buses <br>\nheading to Jakarta to enter the toll road.<\/p>\n<p>IPB management argued that the parking lot would be a source <br>\nof income for the insitute, which needs Rp 18 million per student <br>\nannually to cover costs but charges only Rp 10 million per <br>\nstudent yearly.<\/p>\n<p>Aside from that, the management also supported the <br>\nadministration's claim that traffic congestion would be eased <br>\naround the area.<\/p>\n<p>Meanwhile, on the other side of Jl. Pajajaran, the new gate to <br>\nthe botanical gardens, which is also the mouth of the underpass,  <br>\nis nearly finished. A shelter over the gate and ticket counters <br>\nare yet to be built.<\/p>\n<p>The project's management did not indicate when the underpass <br>\nwould be completed.<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/bogor-botanical-gardens-underpass-already-under-construction-1447899208",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}