{
    "success": true,
    "data": {
        "id": 1442371,
        "msgid": "arianespace-postpones-again-telkom-1-satellite-launch-1447893297",
        "date": "1999-08-05 00:00:00",
        "title": "Arianespace postpones again 'Telkom-1' satellite launch",
        "author": null,
        "source": "JP",
        "tags": null,
        "topic": null,
        "summary": "Arianespace postpones again 'Telkom-1' satellite launch JAKARTA (JP): European company Arianespace again postponed the launch date for state telecommunications company PT Telkom's Telkom-1 satellite, Arianespace announced on Wednesday. The company said in a statement the decision was made after an electrical anomaly was detected during a check of the Ariane-42P rocket's third-stage cryogenic engine. The Ariane-42P is the rocket which will be used to put the satellite in orbit.",
        "content": "<p>Arianespace postpones again 'Telkom-1' satellite launch<\/p>\n<p>JAKARTA (JP): European company Arianespace again postponed the<br>\nlaunch date for state telecommunications company PT Telkom's<br>\nTelkom-1 satellite, Arianespace announced on Wednesday.<\/p>\n<p>The company said in a statement the decision was made after an<br>\nelectrical anomaly was detected during a check of the Ariane-42P<br>\nrocket's third-stage cryogenic engine. The Ariane-42P is the<br>\nrocket which will be used to put the satellite in orbit.<\/p>\n<p>Because the anomaly was detected the day before the launch,<br>\nAriane decided to replace the system as a precautionary measure.<\/p>\n<p>\"The replacement operation will require several days and a new<br>\nlaunch date will be announced as soon as possible,\" the company<br>\nsaid.<\/p>\n<p>It is the second time the launching of the Telkom-1 has been<br>\npostponed.<\/p>\n<p>Telkom-1 was initially to be orbited on April 27 in a bi-<br>\nsatellite launch with the Asiastar satellite of United States-<br>\nbased company Worldspace. This launch was to occur with<br>\nArianespace's more advanced and powerful Ariane-5 rocket.<\/p>\n<p>However, because the Asiastar satellite was unprepared for the<br>\nlaunch, Arianespace and Telkom agreed to launch Telkom-1 on its<br>\nown from Kourou, French Guiana, on Aug. 4 aboard the Ariane-42P<br>\nrocket.<\/p>\n<p>Telkom said the delays did not affect its launch agreement<br>\ncontract with Arianespace.<\/p>\n<p>Arianespace signed in April 1997 a deal with Telkom to launch<br>\nthe Telkom-1 satellite on a Ariane-504 rocket in April this year<br>\nfrom the company's launch site in Kourou.<\/p>\n<p>Telkom-1 was expected to begin its commercial operations in<br>\nSeptember, covering countries in Southeast Asian, as well as<br>\nnorthern Australia.<\/p>\n<p>The satellite, weighing 2,655 kilograms and carrying 24 C Band<br>\ntransponders and 12 Extended C Band transponders, will be the<br>\nthird Indonesian satellite launched by Arianespace. The company<br>\nlaunched Palapa C2 in May 1996 and Cakrawarta in November 1997.<\/p>\n<p>Telkom-1 was developed to replace another one of Telkom's<br>\nsatellites currently in orbit, the Palapa-B2R, which is due to<br>\nend its service-life in mid-2001.<\/p>\n<p>Minister of Communications Giri Suseno, who was in Kourou to<br>\nobserve the Telkom-1 launch, considered Arianespace's decision to<br>\ndelay the launch understandable, according to Telkom's acting<br>\nspokesperson Darmono.<\/p>\n<p>Darmono said Giri agreed it was safer to delay the launch and<br>\nexamine and replace the malfunctioning system, rather than<br>\nproceed with the launch and face a possible rocket or satellite<br>\nfailure.<\/p>\n<p>He said the electrical anomaly could affect the lift-off power<br>\nof the rocket and change the accuracy of the launch.<\/p>\n<p>Telkom's assistant vice president for internal relations,<br>\nWidarto, said Telkom expected the inspection and installment of<br>\nthe new electrical equipment on the Ariane-42P rocket could be<br>\ncompleted in nine days.<\/p>\n<p>\"We expect the rocket will be ready for launch by Friday next<br>\nweek,\" he said.<\/p>\n<p>Telkom-1 will provide various telecommunications services,<br>\nincluding high-speed Internet and multimedia access, a satellite<br>\ntelephony network, backbone transmissions and analog or digital<br>\nbroadcasts, for 20 years.<\/p>\n<p>The Telkom-1 satellite project cost around US$191.4 million,<br>\ncomprising a $84.8 million satellite contract with Lockheed<br>\nMartin, a $90.1 million launch contract with Arianespace, a $15<br>\nmillion insurance package with local firm Jasindo and $1.6<br>\nmillion for consultancy services from Canadian firm Telesat.<br>\n(43\/cst)<\/p>",
        "url": "https:\/\/jawawa.id\/newsitem\/arianespace-postpones-again-telkom-1-satellite-launch-1447893297",
        "image": ""
    },
    "sponsor": "Okusi Associates",
    "sponsor_url": "https:\/\/okusiassociates.com"
}